MK2 DOOR

 

Step 3:

 

Remove  the  Door.  Pre

-

drill  and  screw  another  2  screws 

between  the  centre  screw  and  the  rivets  at  each  end        
(5 screws  per  track).  Screw  track  using  45mm  door  track 
screws.

 

Step 2:

 

Hang the door in the Door Track. At the right hand end of 
Door  Track,  adjust  up  or  down  so  that  the  Door  hangs  
parallel with shed. Fit one rivet at right hand end to hold in 
place. Repeat with left hand end of track.

 

Note: Only use rivets at each end of track.

 

Step 1:

 

Position the Door Track (107) on the front wall with the top 
of  the  track  7mm  below  the  top  of  the  timber  frame.  The 
end  of  the  door  track  should  be  20mm  in  from 

 

outside of the right

-

hand corner flashing. 

 

 

Pre

-

drill a hole in the centre of the track and screw in place 

using one 45mm door track screw. Remove ALL drill filings

 

Note: Ensure Door Track screws are screwed in horizontal  and 

screwed  hard  into  flashing.  Protruding  screw  heads 
can cause door rollers to bind on the screw heads.

 

Step 4:

 

Clean out ALL drill filings. Also make sure the Wheels are 
cleaned of drill filings. Re

-

hang Door. 

 

 

Door Stops: Predrill a hole  in right

-

hand end of track,45mm 

in from outside edge of Corner Flashing. 

 

 

Predrill hole in left

-

hand end of track, 45mm from outside of 

door jamb. 

(60mm for Security door option.)

 

 

Screw door stops in  using 1 x Roofing screw per stop.

 

 

Check door doesn't protrude past outside edge of shed.

 

 

 

12

 

MK2 DOOR

 

10

 

Step 5:

 

Bottom  Door  Guide:  Slide  the  Door  to  the  corner  of  the  shed. 
Place    the  Door  Guide  (108)  over  the  Guide  Brackets  on  the 
door and align the end of the Door Guide 20mm in from outside 
of the right

-

hand corner flashing. 

 

Step 6:

 

Lift the door guide up approximately 3mm so that the Door will 
Slide freely. Pre

-

drill a hole through the door guide and the end 

rib of the cladding and screw in place using a 45mm screw. 

 

Step7:

 

Slide the door to the centre, ensuring that it slides freely. Pre

-

drill and insert a screw in the other end of the Door Guide. 
Check that the Door is not binding in the middle then pre

-

drill 

and fix with 3 more screws, one in the centre of the guide and 
the other 2 evenly spaced between (5 screws per guide)  into 
the door step flashing and rib.

 

Note:

 

For sheds with Raised Base Plate option the Door Step Flash-
ing will protrude down past the Bottom Plate.

 

Attach Door Guide with rivets.

 

7mm

 

20mm

 

DOOR

 

GUIDE   

 

DOOR       

 

CLADDING

 

BOT-

PLATE

 

GUIDE BRACKET

 

Summary of Contents for SHEDS MK2

Page 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK2 BASE SIZE 2545mm x 1715mm...

Page 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Page 3: ...150m 0 710 x 0 240m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Over Panel For Gable ends only Window Hardware Pack 2 000m 1 000m 1 000m 1 175m 1 Roof Sheets Flat Roof Sheet Clea...

Page 4: ...LLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 785 2545 45 45 45 FRONT WALL 883 45 795 45 785 45 45 1205 2545 45 45 45 BACK WALL 883 45 1205 1900 or 1870 for Raised Base Plate only 1900 or 1870...

Page 5: ...e over onto its base Pieces of timber from the packaging may be used to temporarily brace the frame before rolling it over Position 1 625 End Wall Nogs 883m down from Top Plate and nail in place If fi...

Page 6: ...N To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be re positioned the nails can easily be prized out If a win...

Page 7: ...tack in place Re peat with remaining sheet Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan into the Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan...

Page 8: ...ll holes in each corner and nail Window Frame to framing using 50mm nails Step 4 If the Window is in the gable end tempo rarily position the Over Panel above Win dow Frame Following the same angle as...

Page 9: ...tom Plates and hard against Stud Attach Door Jamb Flashing with three rivets into Rib on the outside and three 30mm clouts into studs on the inside Repeat with the other Door Jamb Step 3 Fit Corner Fl...

Page 10: ...hole in right hand end of track 45mm in from outside edge of Corner Flashing Predrill hole in left hand end of track 45mm from outside of door jamb 60mm for Security door option Screw door stops in u...

Page 11: ...to Back Top Plate Repeat at the front Note The 6 x 50mm Clouts on end ribs are covered by the Barge Flashings Step 2 Position first Roof Sheet centrally over Ridge Beam on the right hand end of shed w...

Page 12: ...r panel to ridge beam using one 30mm clout per pan Position on ridge beam and screw in place using six 50mm roofing screws Screw one 50mm roofing screw into ridge beam through each rib on overlap one...

Page 13: ...straight then rivet to Roof one rivet every second Rib Note MK2 shown Note MK2 shown MK2 FLOOR Optional Step 1 Place shed in final position Check the diagonal measurements are the same and the shed is...

Page 14: ...into Joists Measure and cut Floor Flashing 110 to fit in between Door Jamb Flash ings and nail in place using 50mm Clouts MK2 HASP STAPLE Using six rivets and one 50mm clout attach hasp to Door Jamb F...

Page 15: ...on a purpose built floor concrete cob bles ply etc the Wall Sheets will protrude 20mm below the Base Plate This will stop water flowing in between the Base Plate and Floor The Floor should be made 15...

Page 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Reviews:

Related manuals for SHEDS MK2