Step 2:

 

On  the  left  hand  side  of  the  front  wall  fit 
Corner  Flashing  (101)  over  Door  Jamb 
Flashing and rib . With top of the Corner 
Flashing  flush  with  the  top  of  the  Top 
Plate, rivet in place using six rivets. 

 

KL1 DOOR JAMB & CORNER FLASHINGS

 

Step1:

 

Fit Door Jamb Flashing (104) in between 
Top and Bottom Plates and hard against 
Stud.  Attach  Door  Jamb  Flashing  with 
three  rivets  into  Rib  on  the  outside  and 
three  30mm  clouts  into  studs  on  the  in-
side. Repeat with the other Door Jamb.

 

Step3:

 

Measure  and  cut  Doorstep  Flashing  (106)  to 
fit in between Door Jambs. Position the Door-
step  Flashing  in  between  the  Door  Jambs  at 
bottom of doorway, nail through top of flashing 
using  three  30mm  Clouts.  Repeat  with  the 
Overdoor Flashing (105).

 

Step 4:

 

Fit  remaining  three  Corner  Flashings  over 
corner Ribs and rivet in place using six riv-
ets per flashing. When fitting right hand Cor-
ner  Flashing  on  the  front  wall,  ensure  it  is 
parallel with the Door Jamb.

 

DOOR JAMB

 

STUD

 

PLATE

 

CORNER

 

FLASHING

 

FRONT PLATE

 

CLADDING

 

END

 

Step 5:

 

Position  Ridge  Cover  (A109)  on  Ridge 
Beam.  While  holding  straight  and  square, 
nail  top  of  Ridge  Cover  Flashing  to  Ridge 
Beam using three 30mm clouts. Rivet front 
of Ridge Cover to Ribs and Flashings using 
seven rivets.

 

Summary of Contents for KL1

Page 1: ...Quality Built In ASSEMBLY INSTRUCTIONS KL1 BASE SIZE 1715mm x 1210mm...

Page 2: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Page 3: ...580m 0 603 x 0 603m 0 588 x 0 150m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Window Hardware Pack 1 450m Clear Roof Panel Security Single Door Hardware Pack Alarm MA20 Shed lig...

Page 4: ...RAME 4 1 810 YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 1120 1210 45 45 45 END WALL 883 45 45 795 1715 90 45 45 FRONT WALL 883 45 785 1900 or 1870 for Raised Base Plate only 1945 or 1915 for Raised Base...

Page 5: ...p 3 Select one 1 715m Base Plate Green and the Ridge Beam 90 x 45 Nail in place Ensure Green joins to Green Step 4 Carefully roll the frame over so that the Ridge Beam and Base Plate Green are on the...

Page 6: ...el Use either crayon or ink to mark steel TERMS EXPLANATION To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be...

Page 7: ...th the LIP on the right hand side Over lap as shown in fig 1 Ensuring Wall Sheet is flush with top of Top Plate tack in place Step 4 Nailing Off Nail one 30mm Clout each side of the Rib two per Pan in...

Page 8: ...Lay out the two window studs 883mm and Nog 634mm on a flat surface Position Nog and nail in place using 2x 75mm nails at each end Step 6 From the inside of the shed slide Louvre Glass into Louvre Uni...

Page 9: ...lashing 106 to fit in between Door Jambs Position the Door step Flashing in between the Door Jambs at bottom of doorway nail through top of flashing using three 30mm Clouts Repeat with the Overdoor Fl...

Page 10: ...f the Door Guide 20mm in from outside of the right hand corner flashing Step 6 Lift the door guide up approximately 3mm so that the Door will Slide freely Pre drill a hole through the door guide and t...

Page 11: ...ground it may be necessary to temporarily brace the shed with pieces of timber from the packaging Step 3 Position roof so that the front overhang measures 140mm Line up Ribs on the Roof Sheets with R...

Page 12: ...to the Barge Flashing at each end Repeat with other Spouting Step 2 Centralise Barge Flashing on end and rivet in place one rivet into every second Rib Fit two rivets through top of Barge into Rib Re...

Page 13: ...a Floor Board on top of Bottom Plates and Joist and push up against end wall Mark out where Studs are Cut checkouts with Electric Jigsaw so Floor Board will fit around Studs Step 3 Re position Floor...

Page 14: ...ote See below for security option 14 SECURITY DOOR Optional Step 2 Once door is hung position the Locking Stays so they slide into the Locking Brack ets easily Screw Locking Stays to Door Jamb Step 1...

Page 15: ...lthough it is not essential fitting Damp Proof Course in between the Base Plate and the Floor will give added protection against moisture CLEAN UP Remove all swarf drill filings with a soft brush or r...

Page 16: ...rried out in accordance with instructions below Should the cladding fail to perform as specified above the liability of Riverlea Group Ltd shall in all cases be limited to replacing or repairing the d...

Reviews: