background image

DL

DR

E. Door

Apply silicone around the perimeter 
of the base ‘U’ channel. Seal the 
corners, joints and base of door 
column. This is optional and should 
be done for heavy rain areas if 
needed.

Note

Base ‘U’

channel

Silicone

Column

Fig.2

Silicone

Base ‘U’

channel

Fig.1

Option-2  Concrete

28

DL

DR

1

2

Summary of Contents for Woodbridge

Page 1: ...0 OWNER S MANUAL Instructions for Assembly 10 Ft WoodBridge Patent 416 091 Vinyl Garden Shed Vinyl Garden Shed A Product of TM A L L P U R P O S E V I N Y L G A R D E N S H E D S Building Dimensions A...

Page 2: ...e and other causes which is beyond our control Claims under this warranty must be made within the warranty period by calling 1 800 483 4674 or mail in a dated sales slip and clear photograph of the pa...

Page 3: ...the steps given in the manual carefully for correct assembly 7 Make sure all parts are present before you start assembling 8 BE SAFE Follow safety instructions and avoid injury See inside page 9 GROU...

Page 4: ...sembly of the shed Familiarize yourself with the operation of all the power tools 3 Children and pets should be kept away from the assembly site to avoid any distractions and accidents 4 When using a...

Page 5: ...poured to a thickness of 4 inches 100mm to 5 inches 125mm Allow to dry thoroughly for at least 48 hours Your shed must be firmly anchored to the concrete pad or large concrete patio stone squares to h...

Page 6: ...A CB1A CB2A CB3XA CB4A MJ RS1A RS3E RS8A RS9A RS5E RS2A RS10A DSH RS14A CDLA CDRA CCA CMA FDCL FDCR FCB FMC FCC RJ EPS CBC PIN PPG PWS S1 S2 CODE QTY F01A 2 F02A 2 F03 4 F08 6 B1LA 1 B1RA 1 B2 2 B3LA...

Page 7: ...MJ CB3XA CB3XA CB2E SP SP DL DR CDLA CB1A CB4A CB2E CCA FPL FPR RS1A DSH RS1A RS8A RS9A RS2A RS9A RS2A FPR RS3E RS3E RRS CDRA FPL RS2A RS2A CCA SP CCA CMA CMA CMA SP SP SP SP CCA SP RP RP RS5E RS5E R...

Page 8: ...instructions are followed step by step 2 All parts are clearly marked and care should be taken to use the correct one 3 Don t install under windy conditions 4 If you are building the shed against a wa...

Page 9: ...8 3 F03 F03 S1 F08 F08 F08 F08 S1 4 Front F01A F02A B1LA B1RA B3RA B3LA S1 B2 B2 F08 5 F01A F02A...

Page 10: ...arts Needed Code Qty CMA 3 CCA 4 CDLA 1 CDRA 1 CB1A 2 CB2E 2 CB3XA 2 MJ 1 CB4A 2 FCB 4 CBC 1 SP 8 S1 41 S2 4 1 2 3 All parts are clearly marked and care should be taken to use the correct one Note Fig...

Page 11: ...amped label on top of all panels inside Note SP 2 B1RA CDRA Fig 1 SP Fig 2 CCA B1RA B2 Fig 1 CCA SP Fig 3 CCA SP 4 S2 CCA FCB Fig 1 Do not tighten the screw Leave it loose Note 3 S1 1 SP CDRA 1 2 3 CC...

Page 12: ...Fig 3 CB4A CB1A EPS 11 S1 CB1A CDRA Fig 2 5 6 Fig 1 CB1A S1 FCB CB4A B1RA Fig 1 S1 CB4A CDRA Fig 2 S1 1 2 CB1A CDRA 1 2 3 CDRA CB4A B1RA S1 S1 7 MJ CB3XA CB3A S3 CB3XA CB3XA CB3XA MJ Right...

Page 13: ...SP Do not tighten the S2 screw Leave it loose Note 8 1 2 3 SP Fig 1 B2 CCA Fig 2 Fig 3 B3RA CCA CCA B3RA S1 CCA SP B3RA 9 CB2E S1 FCB Fig 1 FCB CCA S2 Fig 2 FCB CB2E 1 2 1 2 SP Fig 1 CCA Fig 2 CMA 10...

Page 14: ...2 CB3XA FCB S1 CB3XA CB2E S1 CB3XA S1 CMA Fig 3 11 CMA 3 1 2 CB3XA CB3XA Back Wall CMA CMA SP 1 2 Back Wall Fig 1 Fig 2 1 4 3 2 CBC CB3XA SP CMA B3LA Back Wall SP CMA S1 Fig 2 CB3XA S1 CMA Fig 3 Fig 1...

Page 15: ...ighten the S2 screw Leave it loose Note Fig 2 CB3XA B2 B3LA CCA Fig 2 Fig 3 S1 B2 CCA SP CCA Fig 1 SP CCA B2 1 2 3 Fig 1 SP CCA Fig 4 S1 B1LA CCA B1LA B2 CCA Fig 3 SP CCA Fig 2 1 2 3 4 CCA SP 14 15 16...

Page 16: ...15 Do not tighten the S2 screw FCB CCA Fig 3 1 2 3 4 Note S1 FCB Fig 4 CB2E CB2E FCB S1 Fig 1 CB2E S1 Fig 2 FCB CB3XA S2 CDLA SP CDLA SP B1LA 17 18 CB2E Left Left 1 2 Fig 1 CDLA B1LA S1 Fig 2...

Page 17: ...1A CB2E S1 Fig 2 CDLA CB4A CB4A B1LA S1 Fig 1 Fig 2 Fig 3 CB4A CB1A EPS After completing the center band assembly fully tighten the four center band fittings FCB to the corner column CCA Note S1 Note...

Page 18: ...C Roof Structures 17 1 Parts Needed Code Qty RS1A 4 RS2A 4 RS3E 2 RS5E 4 RS8A 4 RS9A 4 MJ 2 RS10A 2 Code Qty DSH 1 FDCL 1 FDCR 1 FCC 4 FMC 3 RJ 4 S1 90 S2 4 FMC CMA S1 CMA...

Page 19: ...Fig 1 Fig 2 CDLA FDCL S1 CDRA FDCR S1 18 3 CDRA FDCR FDCL CDLA FCC CCA FCC CCA S1 2 CCA 1 2 FCC...

Page 20: ...19 Front roof structure assembly RS1A RS1A R S 2 A S1 RS9A RS9A RS2A RS8A RS8A RS2A RS2A S1 RS1A RS1A MJ 5 4 6 Make sure these holes up S1 RS9A RS1A RS8A RS9A RS1A RS8A...

Page 21: ...20 Back roof structure assembly RS1A RS1A S1 RS1A RS1A MJ Make sure these holes up RS2A RS2A S1 RS8A RS8A RS9A RS9A RS2A 7 8 9 RS8A RS8A RS9A RS9A RS1A S1 RS1A...

Page 22: ...21 10 Fig 1 Front Fig 1 RS1A CDRA Fig 3 RS1A CDLA Fig 4 S1 FDCL RS1A 11 RS1A RS1A RS2A 1 2 3 4 Fig 2 S1 FDCR RS1A RS1A RS1A RS2A RS2A S1 RS3E 1 2 RJ RS3E Fig 2 RS3E RJ Make Two Sets Note...

Page 23: ...22 1 12 RS1A DSH S1 Fig 1 DSH S1 Fig 3 DSH RS1A Fig 2 DSH S1 Front 2 RS1A FMC S1 13 Back CMA 3 1 2...

Page 24: ...23 S1 RS9A 15 1 2 RS5E RS5E Fig 2 RS8A RS5E RS5E S1 RS8A Fig 1 RS5E S1 RS8A RS8A RS5E RJ Fig 1 S1 RJ RS1A Fig 2 RJ FCC S2 Fig 3 S1 Fig 4 RS2A 14 RS3E RS3E RS3E 1 2 3 4...

Page 25: ...24 17 Fig 2 Fig 1 RS5E S1 RS9A RS5E S1 RS9A 1 2 Fig 1 RS10A S1 RS5E Fig 2 RS10A RS5E RS5E S1 16 2 1 RS10A RS10A...

Page 26: ...2 FPR 2 RRS 1 PPG 48 PIN 48 RS14A 4 FPR PPG PIN Front 25 2 4 Note Insert roof plugs into Facia Panel only as indicated Apply silicone into the holes before inserting the pins FPR PPG PIN Front FPL PP...

Page 27: ...roof plugs into roof panels only as indicated Note 26 5 6 9 Apply silicone around the roof plugs and the pin holes before fixing the pins RP PPG PIN left Silicone 7 8 RP PPG PIN RRS PPG PIN Inside Vi...

Page 28: ...luded After completing the assembly of shed place exterior grade CDX 3 4 19 mm plywood inside the foundation Option 2 Concrete Note 682mm 26 7 8 538mm 21 1 8 682mm 26 7 8 538mm 21 1 8 682mm 26 7 8 753...

Page 29: ...the perimeter of the base U channel Seal the corners joints and base of door column This is optional and should be done for heavy rain areas if needed Note Base U channel Silicone Column Fig 2 Silicon...

Page 30: ...29 After completing the panel assembly apply silicone around the roof plugs This is optional and should be done for heavy rain areas if needed Note...

Page 31: ...an be installed on any of the wall panels However we recomend mounting them on the top of the shed s back wall TOOLS YOU WILL NEED Power Drill Dia 3 16 5mm drill bit Dia 1 2 12 5mm drill bit VC VCP 5m...

Page 32: ...4 Dia 4 2 x 16mm 5 32 x 5 8 Sheet Metal Screw 28 Attach each side panel SP on the bottom to the Base U channel Using a dia 3mm 1 8 drill with a power drill make two equal distance holes on the Base U...

Page 33: ...l Roof Structures S4 Base U channel S4 The DURAMAX shed has been tested and passed wind loads of up to 115 mph in a controlled laboratory environment Natural high wind areas create wind at unpredictab...

Page 34: ...Wood Metal on soil For heavy wind area ANCHOR KIT Concrete Eye bolt with wire rope for sheds installed with foundation Wood Metal on concrete For heavy wind area ANCHOR KIT Foundation Strap clamping...

Page 35: ...U S Polymers Inc 1057 S Vail Ave Montebello CA 90640 United States of America...

Reviews: