background image

 

 

8 Configuration 

 

8.1

 

Downloading the Installer App 

 
Phone / Tablet: Use the QR code to download the app   >>> 
 
Web-browser: 

https://pv.duracellpowercenter.app

 

 
 

8.2 Wi-Fi setup 

 

1.

 

Open the 

Installer App

, and login using account credentials.   

Note: First time users must request an account from the 
reseller. 

2.

 

Click on the 

[Network Configuration]

 icon. 

3.

 

Select 

[Wi-Fi]

 and enter the customer supplied network and 

password credentials.  

4.

 

Click 

[SEND TO DTU]

 to complete. 

 

 
 

8.3 Creating the site map in the Installer App 

 

1.

 

Open the 

Installer App

, and login using account credentials. 

2.

 

Select the 

[Station]

 tab at the bottom of the page, then select 

[+]

 at the top-right. 

3.

 

Select 

[Quick] 

for a single unit installation, or 

[Professional]

 for a mult-unit installation. 

4.

 

Fill in all fields applicable to the unit(s) being installed. Select 

[Next

] when completed. 

5.

 

Select 

[Add DTU ID]

 then 

[scan]

, (or manually input the DTU ID).  Select 

[Next

] when completed. 

6.

 

Select 

[Start binding]

, then choose the angle/tilt for the PV array. 

7.

 

Select 

[scan microinverter ID]

, (or manually input the microinverter IDs as indicated on the 

Installation Map sheet, and click the check box after completing each ID). Select 

[Next

] when 

completed. 

8.

 

Select 

[Finish]

 when all microinverter IDs have been added. 

9.

 

[Disable]

 the scan function (top-right) and design the 

Layout base

 on the installation. Select the 

check box (top-right), and then select 

[Next]

 after completing the design. 

10.

 

Upload a picture of the site and select “Finish” to complete the site creation.  The new site will 
appear on the station list within the Installer account. 

11.

 

Select the 

[Networking]

 command button after ther power station has been created. 

 

Note: It may take up to 30 minutes for the power station to appear online with all microinverter IDs 
detected. 

 

 

 

Summary of Contents for PC-PRO-WIFI

Page 1: ...POWER CENTER USER MANUAL Model PC PRO WIFI For use with Duracell Power Center Microinverters...

Page 2: ...4 Locating the Power Center Hub 4 4 1 Installing the antennas 4 4 2 Proximity to the PV array 4 4 3 Proximity to the customer supplied internet router 4 4 4 Mapping the Power Center Hub to the PV arra...

Page 3: ...ent damage Do not install the equipment in adverse environment conditions such as flammable explosive corrosive extreme high or low temperature and humidity Do not use the equipment when the safety de...

Page 4: ...V panels PV port inputs Mutiple gateways can be provisioned where PV arrays exceed this limit 3 1 2 Basic requirements prerequisites 120VAC power outlet required for the POWER CENTER HUB power adapter...

Page 5: ...ons Indicators B Power C Server communication D Microinverter communication E System alarm Other Features A SD card slot N Antenna screw type O Wall bracket P Serial number label Ports F Wi Fi antenna...

Page 6: ...NTER HUB can communicate with the router via hard wired ethernet or Wi Fi The ideal location for microinverter communication may conflict with router communication In the case that the resulting Wi Fi...

Page 7: ...t Modes LED State Description Firmware update Initializing Power ON Server online Internet offline Internet online server offline Local APP connected Microinverter communication OK Microinverter IDs i...

Page 8: ...it s being installed Select Next when completed 5 Select Add DTU ID then scan or manually input the DTU ID Select Next when completed 6 Select Start binding then choose the angle tilt for the PV array...