These instructions are for installation of the Dura-Breeze Screen
Room under a Dura-Fold Awning.
General Information
Throughout these instructions the
fl
oor of the room is referred to as “deck”. The
quality of the
fi
nished job is best when the deck is level and every effort should be made to
level the deck, if necessary.
If the deck is concrete, it will be necessary to drill and install the provided plastic
shields.
For best results installing the Screen Wall Panels, the existing awning posts must be
plumb. And, the front posts must be spaced 48” on center, except at the corners where they
must be 44-3/16 on center.* See Post Spacing Drawing below.
*If your front wall is 10
‛
, 14
‛
, 18
‛
, 22
‛
, 26
‛
, etc., you will have a 24” Half-Panel at a front corner.
Posts for this panel must be 20-3/16” on center.
The Corner Post is offset
3 - 13/16”
to allow the side wall panel to clear the post and
join the front wall panel.
Note: The Corner Posts need
the Knob to be facing
away from the Corner.
Install the 1/2” x 3/4” Dark Gray Foam Tape.
Position it on bottom of Front Header between the
Valance Track and snug up against the Post Top Track.
See Drawing.
Install the tape the full length of the
awning...starting and ending at outside edge of each
corner Post Top Bracket. Slice through foam tape at
each edge of Coupler Lock Cover so that Cover can be
removed.
Do not
remove tape from the Coupler Lock
Cover.
Page 1
1/2” x 3/4”
Dark Gray
Foam Tape