background image

STEAMTECH

 

 

5.  TECHNICAL DRAWINGS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

7

 

DUPLEX UK– 01/17

 

Summary of Contents for STEAMTECH 12000

Page 1: ...STEAMTECH 12000 4000 ENGLISH 1 DUPLEX U K 01 17...

Page 2: ...LEASE READ THE SAFETY INSTRUCTIONS ON THIS HANDBOOK BEFORE PROCEEDING ON THE FIRST USE EVENTUAL DAMAGES DUED TO THE CARRIAGE MUST BE COMUNICATED AS SOON AS POSSIBLE TO YOUR OWN RETAILER ATTENTION STEA...

Page 3: ...CLABLE MATERIALS THAT SHOULD BE DELIVERED TO THE CENTERS SUITABLE FOR THE DISPOSING OF THE WASTE ELECTRIC AND ELECTRONIC EQUIPMENT BATTERIES OIL AND SIMILAR SUBSTANCES MUST BE RECICLED IN THE PROPER R...

Page 4: ...hem and to substitute them through an authorized service center every 2 years starting from the purchasing date PRESSURE SWITCH This machine is equipped with a pressure switch able to check and to mai...

Page 5: ...achine if the power cord or other important parts of the machine are damaged i e safety devices pressure hoses and trigger gun If an extension cord is used the plug and socket must be of a watertight...

Page 6: ...endable stainless steel boiler with automatic refilling system which allows it to produce a powerful and continuous supply of steam 24 24 hours The STEAMTECH model is also equipped with a separate det...

Page 7: ...STEAMTECH 5 TECHNICAL DRAWINGS 7 DUPLEX UK 01 17...

Page 8: ...STEAMTECH 8 DUPLEX UK 01 17...

Page 9: ...STEAMTECH 9 DUPLEX UK 01 17...

Page 10: ...STEAMTECH 10 DUPLEX UK 01 17...

Page 11: ...nal 17 Electric socket for vacuum cleaner 62A Insert steel steel L 145mm optional 18 Handle bar 63 Insert brush brush L 145mm optional 19 Hand wheel screw for handle bar 20mm 64 St steel brush 60mm op...

Page 12: ...pecific instructions normally 1 liter detergent for every 10 liters water about 10 is the detergent percentage making sure to fill in first the detergent to obtain a better mixing Please be careful wi...

Page 13: ...switch 35B Attention Using the switch 35B you will get hot water under pressure which according to the model of the machine can reach a temperature of 180 c please pay attention that the switch has n...

Page 14: ...lide the latch into BLOCK position then screw the hand wheel screw 40A only for 10 bar models Follow the same procedure in attaching the rectangular 72 or the triangular brush 74 which can be covered...

Page 15: ...er drain cap 23 underneath the machine Then activate the general power switch 11 and switch it to the position general ignition 12 letting the water pump working for a couple of minutes then put the g...

Page 16: ...STEAMTECH MAINTENANCE OF THE ACCESSORIES Grease occasionally joints on the accessories and hose extensions PG5123 OR 29 82x2 62 PG5106 OR 9 25x1 78 PG5116 OR 6 75x1 78 16 DUPLEX UK 01 17...

Page 17: ...ring Clean and lubricate the o ring with grease connections of the accessories if necessary replace with one spare supplied Steam does not come out A Boiler has not reached yet the operational A Wait...

Page 18: ...the specifications of directives 2006 95 CE 2004 108 CE 2006 42 CE 2002 95 CE Per il controllo della conformit alle sopraindicate direttive sono stati seguiti i seguenti standard For the checking of...

Page 19: ...nce procedure Generator Date of Intervention description replaced components etc working hours intervention THE MANUFACTURER RESERVES THE RIGHT TO PRODUCE TECHNICAL AND STRUCTURAL IMPROVEMENTS WITHOUT...

Page 20: ...STEAMTECH 20 DUPLEX UK 01 17...

Reviews: