- 17 -
8. Select sintering schedule. 9. Confirm temperature and adjust if it is necessary
. < Refer page 15 to set temperature>
10. Ready to sinter ->Start sintering 11. Finish sintering
”
12. Remove tray after finishing sintering
<Caution>
①
Do not place hot tray in front of the furnace. May cause controller damage.
②
Place hot tray sides of the furnace.
③
Open the door when temperature is lower than 100 oC. May cause burn skins and
fire.
Summary of Contents for S-6100
Page 1: ......
Page 2: ...1...
Page 19: ...18 10 Sintering Bridge Frameworks...
Page 25: ...24 MEMO...
Page 26: ...25 MEMO...