- 16 -
9. Run
1. Drying materials (About 30 min.) 2. Furnace Main S/W on
3. Open the door 4. Place restorations on the zirconia
beads in Tray.
Push handle counter clack wise to open door
5. Place Tray with Lid in the center of the chamber (marked area)
6. Place Tray in the chamber 6. Covered tray with Plate (recommand)
Summary of Contents for S-6100
Page 1: ......
Page 2: ...1...
Page 19: ...18 10 Sintering Bridge Frameworks...
Page 25: ...24 MEMO...
Page 26: ...25 MEMO...