GENERAL GUIDANCE 

 

1. 

Preparation 

 

Planning and preparation of ceiling openings to

 

is important; openings should be uniform, 

 

straight and free from all obstructions prior to 

 

panel installation. It is essential to co-ordinate 

 

all installation works with other trades. 

2. 

Layout 

 

Panel runs should be set out on a layout plan.  

 

Radiant panels should be concentrated in areas 

 

of highest heat loss i.e. around the outside

 

perimeter of the room, particularly, near 

 

windows. This will counteract disproportionately

 

high heat losses. Single or dual circuit runs

 

should be considered- see Water flow rates 

 

and Hydraulic Resistances below. 

4. 

Maximum mounting height 

 

There is no maximum mounting height for

 

Evo-Lite. However, when mounting heights 

 

exceed 4m, the heat load should be adjusted to

 

allow additional losses of radiant heat incident

 

on walls, and stratification of air which absorbs 

 

some heat by convection. 

5. 

Minimum mounting height 

 

There is no minimum mounting height for

 

Evo-Lite. For comfort and safety the following 

 

rule of thumb can be applied:- 

 

 

All Styles 

 

 

LTHW - minimum mounting height 2.4m 

 

 

MTHW - minimum mounting height 3.0m 

 

Contact Dunham-Bush for further information 

 

on mounting heights and comfort conditions. 

5. 

Expansion joints 

 

Expansion joints should be fitted every 6m in a

 

straight panel run. 

6. 

Panel runs 

 

Refer to Diagram 2 for typical arrangements in

 

a panel run. Dunham-Bush will prepare

 

complete baseboard layout drawings for

 

approval, which can be used to co-ordinate 

 

materials and installation on site. 

7. 

Water flow rates 

 

To ensure rated heat outputs are achieved, 

 

water velocity in the tube should be such the 

 

water flow is turbulent. This maximises heat-

 

transfer from the water, through the tube and to 

 

the radiating surface. Water flow rates should 

 

also be limited to inhibit noise and erosion and 

 

high pressure drops. Water velocities should 

 

ideally be between 0.3 - 1.0m/s. 

8. 

Hydraulic resistances 

 

Evo-Lite utilises 15mm OD copper tube to 

 

transport hot water.To calculate the total 

 

pressure drop, determine the water flow rate :- 

 

 

 

 

 

Water flow  = 

      Q       

 

 

rate (kg/s)    

C

p

 

x ΔT

 

 

 

 

 

 

= total heat output (kW) 

 

 

C

p

 

= specific heat capacity of water 

 

 

 

   (kJ/kgK); approx. 4.187 

 

 

ΔT

 

= water temperature drop 

 

 

 

Obtain the hydraulic resistance from the graph

 

below. Note that the water flow rate should be 

 

halved if dual circuit panel runs are used (i.e. 

 

type EH and EJ panels). N.B. circuit length 

 

applies for one circuit only 

 

9. 

Applications 

 

Evo-Lite Style CG is designed to fit into 

 

conventional 'lay-in' tile ceiling grids; panel 

 

dimensions have been optimised so that panel

 

edges are concealed by standard ceiling grid 

 

T-bars - typically 15mm or 24mm. For other 

 

types of ceiling, Style FS or Style CS panels 

 

may be more appropriate. Style WS panels 

 

are designed for vertical wall surface

 

applications. Contact Dunham-Bush for details. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 7 of 8 

Summary of Contents for Evo-Lite Style CG

Page 1: ...h may also be shown on the BL drawing DESCRIPTION Evo Lite Style CG comprises aluminium alloy sheet panel bonded to an extruded aluminium channel profile copper tube carrying the hot water is mechanic...

Page 2: ...suspected at the time of delivery Preparation Evo Lite Style CG radiant panels are intended for horizontal installation within a standard 600mm ceiling grid hence it is important to liase with other t...

Page 3: ...Diagram 3 Typical section detail for installation Style CG 4T shown 2T similar Diagram 4 Suspension point locations for Evo Lite Style CG Page 3 of 8...

Page 4: ...sing panel joint clips and M5 nuts provided Refer to Diagram 6 5 Expansion panels should be fitted every 6m of straight panel run and are supplied with expansion hoses fitted in place of the straight...

Page 5: ...Diagram 6 Installation detail of Evo Lite Style CG standard joint Diagram 7 Installation detail of Evo Lite Style CG expansion joint Page 5 of 8...

Page 6: ...s for leaks Refer to Table 2 for test and working pressures 4 Balance the water flow rate through the panel to accepted practice to achieve the specified flow rate 5 Leave this document and any layout...

Page 7: ...el runs Refer to Diagram 2 for typical arrangements in a panel run Dunham Bush will prepare complete baseboard layout drawings for approval which can be used to co ordinate materials and installation...

Page 8: ...WRITE THE DETAILS OF RADIANT PANELS HERE These details will be required when ordering spares for your Dunham Bush radiant panels STYLE AND No OF TUBES BL DRAWING OR ORDER No DATE OF INSTALLATION Spare...

Reviews: