background image

 

 

 

 

120 State Ave NE #1419, Olympia, WA 98501   |   

www.ducoterra.com

   |    

[email protected]

    |   360.207.4328 

 

Infrared Heating Solutions

 

Figure 2 – T-bar Mounting 

 

WIRING DIAGRAMS 

 

 

       

120 VOLTS 

 

 

 

 

          

 

240 VOLTS 

  

 
 
 
 
 
 
 

Figure 3 – Thermostat wiring connections for panels 

 

WARNING: Panel must NOT be wired to higher voltage than label voltage.  Verify that the power supply 

voltage coming to the heater matches the voltage printed on the heater label. 

 

TESTING INSTALLATION 

After installation, the heating circuit should be checked 
to ensure all panels have been installed properly and are 
functioning normally. With power available, measure the 
branch  load  with  an  amp  meter.  The  amp  meter  value 
should  agree  with  calculated  load  –  if  not,  recheck  the 
installation.    A  physical  check  of  operation  can  also  be 
made – with power to the panels, they should be warm 
to  the  touch  and  prolonged  contact  should  be 
uncomfortable. 

If no power is available to test the circuit, the use of an 
ohmmeter  is  required.  Measure  the  resistance  of  the 
load circuit, isolated from other circuits.  The  measured 
resistance  of  the  heating  circuit  should  match  the 
calculated  resistance.  The  resistance  can  be  calculated 
with the following formula: 

𝑅𝑒𝑠𝑖𝑠𝑡𝑎𝑛𝑐𝑒 =

𝑉𝑜𝑙𝑡𝑠 ∗ 𝑉𝑜𝑙𝑡𝑠

𝑊𝑎𝑡𝑡𝑠

 

 

HEATING PANEL OPERATION 

Ensure  panels  have  been  properly  installed  prior  to 
operation. Radiant heat ceiling panels function best in a 
zone  heating  configuration.  Use  a  programmable 
thermostat to apply appropriate setbacks to spaces that 
are unoccupied. Optimal comfort with a radiant system 

is  typically  obtained  at  air  temperatures  of  around  60-
62F.  

It  is  recommended  that  the  panels  are  dusted  and 
cleaned with a damp cloth every 6 months. Do not use 
harsh cleaners or abrasives or damage to panel surface 
may  result.  Do  not  lubricate.  Make  sure  to  disconnect 
power  to  panels  at  breaker  box  before  cleaning,  and 
allow panel to reach room temperature. 

 

!   

WARNING:

 

Panel  contains  no  user  serviceable 

parts  and  opening  the  heating  unit  will  void  the 
warranty.

 

 

HEATING PANEL MAINTENANCE 

Ducoterra  heating  panels  require  no  maintenance  and 
carry  a  20  year  warranty.  An  occasional  dusting  &  wipe 
down  with  a  damp  cloth  every  6  months  to  maintain 
appearances  is  all  that  is  necessary.  Do  not  use  harsh 
cleaners  or  abrasives  or  damage  to  panel  surface  may 
result.  Make  sure  to  disconnect  power  to  panels  at 
breaker  box  before  cleaning,  and  allow  panel  to  reach 
room temperature. If your panel ceases to operate at any 
time  during  the  warranty  period,  contact  Ducoterra  to 
obtain a replacement panel at no charge (installation and 
shipping costs not covered).  

 

 

Reviews: