background image

 

 

 

 

120 State Ave NE #1419, Olympia, WA 98501   |   

www.ducoterra.com

   |    

[email protected]

    |   360.207.4328 

 

Infrared Heating Solutions

 

For  proper  functionality,  the  heated  space  should  be 
insulated  appropriately.  Optimal  panel  operation  is 
achieved if walls and ceilings are insulated according to 
ASHRAE  189  standards  in  accordance  with  your  local 
climate zone. Heating panel connection box must not be 
covered  with  insulation  material  after  installation. 
Insulation in panel has an R value of 10. 

4.

 

Wiring Requirements and Guidelines 

Heating panel has two 10” 12 AWG leads for connecting 
to  standard  #12  power  supply  with  wire-nut  inside 
attached  connection  box.  See  appropriate  wiring 
diagrams for details (Figure 3 below). 

!

  WARNING:  To  avoid  the  risk  of  electrical  shock, 

personal  injury  or  death,  disconnect  all  electrical 
power  before  installing  or  performing  maintenance 
on this panel. 

The  wiring,  installation,  and  electrical  hookup  of  this  panel 
must  conform  to  local  and  national  codes.  The  use  of  GFCI 
circuits  in  high  moisture  areas  is  recommended.  Total 
wattage of heating panels per circuit must not exceed 80% of 
circuit capacity.  

 

5.

 

Thermostats 

Panels  should  be  installed  in  conjunction  with  a  line 
voltage  or  24V  thermostat.  Thermostats  utilizing  IR 
readings  are  preferred.  Measure  voltage  and  branch 
circuit amperage to determine wattage and panel circuit 
load.    The  thermostat  should  be  located  in  the  same 
room  on  a  side  wall  and  not  directly  under  the  ceiling 
panel.   

6.

 

Surface Mounting Guidelines 

Panels  may  be  mounted  to  joists,  wood,  or  other 
penetrable  surfaces  using  appropriate  hardware.  The 
mounting  holes  are  designed  to  accommodate  #8  –  2” 
pan  head  screws.  Joint  between  panel  and  mounting 
surface should be sealed with heat resistant (rated to a 
minimum of 100C) caulking for maximum performance. 
Surface  of  panel  may  be  painted  with  a  quality  water 
based flat paint to customize appearances. (See Figure 1 
below) 

 

WARNING: DO NOT puncture panel with screws, 

nails, or any other device. Panel must be mounted 
only through the provided mounting holes. 

SURFACE MOUNTING INSTALLATION 

 

1.

 

Cut appropriate sized hole for panel connection box 
and insure clearance from insulating material. 

2.

 

Attach  connection  box  to  back  of  panel  using 
provided hardware. 

3.

 

Attach  power  supply  leads  to  the  panel  leads  in 
connection box. 

4.

 

Position on ceiling in desired mounting location. 

5.

 

Attach  panel  to  ceiling  using  provided  mounting 
hardware. Insert steel caps to close mounting holes. 

Figure 1 – Surface Mounting 

T-BAR MOUNTING INSTALLATION 

 

1.

 

Attach  connection  box  to  back  of  panel  using 
provided hardware. 

2.

 

Lay panel onto the T-Bar grid and secure with hold-
down clips if necessary. 

3.

 

Attach  power  supply  leads  to  the  panel  leads  in 
connection box. 

 

 Be sure electricity is turned off at main switch before wiring to prevent possible injury from electric shock. 

 Be sure electricity is turned off at main switch before wiring to prevent possible injury from electric shock. 

Reviews: