![DTM System DTM GO800 Assembly Instructions Manual Download Page 7](http://html1.mh-extra.com/html/dtm-system/dtm-go800/dtm-go800_assembly-instructions-manual_2535956007.webp)
7
2.3. Stops and locks
Any cables or loops used for manual opening and closing of the gate and gate blocking
mechanisms should be removed, unless they are automatically activated by the drive!
2.4. Mechanical assembly
2.4.1. Initial assembly of the drive - preparation of the gearmotor for installation on the gate
Prepare the elements as shown in Fig. 1.
Assemble the rails in accordance with the drawing 4A, paying careful attention to their precise
sliding with the connecting fittings.
Slip the front element on the rail and put the screw through it so that it can be "grabbed" on the
other side with the help of a spring and a nut, fig. 4B. Using an appropriate socket wrench,
screw in the
screw until the toothed belt is tight
.
Referring to Figure 4C, mount the drive head to the rail, paying attention to the correct positioning
of the drive shaft in the toothed belt pulley spline.
After mounting the drive head, you can proceed to install the ceiling hanger as shown in Fig. 4D.
Other slings can be used if required, e.g. for a much higher mounting surface.
In a correctly assembled rail with a V-belt, find the lower part of the trolley and screw the trolley part
with the unlocking mechanism to it, Fig. 4E. Also attach the cable to help unlock the drive.
2.4.2. Installation of the drive and manual control of working conditions
Measure the center of the gate and mark it at the leaf and lintel above the gate.
Open the door slowly and determine the smallest distance between the most protruding movable part
of the door and the ceiling - THP. This dimension must be at least 35 mm. The spacing between THP and the lower
edge of the C-rail must be at least 5 mm and up to 65 mm (so that the trolley arm was at an angle of 30 °, figure 5.
Close the gate and, depending on the available space, install the drive to the lintel. Trace horizontally,
symmetrically, two holes at a distance of 16 mm from the gate axis each and 20-80 mm above the THP, as shown
in Fig. 5. Drill, depending on the type of substrate, with a 10 mm drill bit in concrete or 5 mm diameter in wood.
Fasten the front handle of the drive to the lintel prepared in this way, Fig. 6A [1] (using expansion
bolts, etc. - so that the fixing ensures a sufficient level of safety. These activities should be entrusted to a
qualified person with the necessary experience). Then, using the pin and cotter pin, connect the front of the
rail to the handle, Fig.6A [2].
Then, using e.g. a ladder (suitably solid and stable), initially level the drive.
If necessary, release the trolley by pulling down once on the emergency release mechanism, Fig. 6C [1].
Move the trolley back and open the gate.
Position the ceiling hanger approx. 300 mm from the controller housing (depending on the door
structure and the ceiling, the hanger can be mounted in the range from 0 to 600 mm relative to the controller
housing, Fig. 6B).
Rys. 3.
Materiały i narzędzia niezbędne przy montażu zestawu.
Mechanical assembly
5mm
10mm
10mm
13mm
14mm
14mm
2x
2x