INITIAL START UP

   *************
*****  WARNING  *****
    *************

EQUIPMENT DAMAGE - DO NOT jump start these engine
generator  sets. Starting these units on a low battery or jump
starting them will cause damage to the engine control module.

Use the following check list to verify correct installation before
starting the engine:

1.

Engine oil.  Fill as required with proper grade/qty.

2.

Engine coolant.  Fill as required with proper
mixture.

3.

Unit mounting base properly bolted down.

4.

Clearance for service and maintenance on all
sides.

5.

Proper fuel line material and size.

6.

All fuel line connections tight.

7.

Fuel line protected and a moisture trap installed
(may be required for N.G.).

8.

Correct LP/NG pressure 4-6 Oz. (7-11" Wc).

9.

Battery connections clean and tight.

10.

Battery fully charged.

11.

All AC and DC wiring installed and properly
protected.

After completing the above checklist, the engine-generator

set is ready for the initial start-up test.

PROCEDURE

Depress the  “RUN” push-button on the front of the DGC.  The
engine-generator will crank and start automatically.  If the engine
fails to start, depress the “stop” push-button and correct the
trouble before proceeding.

With the engine running smoothly check the no load voltage and
frequency on the digital display.  The voltage should be 208/240/
480 AC depending on which model you have and a frequency of
59.5 To 60.5 hertz (Hz).

If you have the proper voltage at the generator the next step is to
check the voltage at the generator terminals in the Automatic
Transfer Switch. The voltage between the G1 and the G3
terminals should be the same as it was on the generator front
panel.  The voltage should also be checked between the hot
terminals (G1 and G3) and the G-N to be certain of a balanced
voltage output and a solid neutral connection.  The voltage
between G1 and G-N should be about 120 volts AC (277 on 480
units).  The same approximate voltage should be found between
terminals G3 and G-N (120 volts AC).

On three phase panels the G2 voltage level should also be
checked.  ON 240 VOLT (DELTA) SYSTEMS BE SURE YOU
KNOW WHERE THE HIGH VOLTAGE "WILD" LEG IS.  IT
MUST BE IN THE SAME LOCATION ON THE LINE SIDE AS IT
IS ON THE GENERATOR SIDE. 
(i.e. if it's on L-3 on the line side
it must be on G-3 on the generator side.

** Notice **

If for any reason during the check out procedure the voltage and
frequency are not correct, depress the “OFF” push-button and
correct the trouble before proceeding.

After verifying that the voltage and frequency are correct, depress
the “OFF” push-button.  The unit should shut off with no time
delay.  You are now ready to test the automatic start function.

To test the Automatic Transfer Switchs follow the instruction in
the operators manual you received with your transfer switch.  If
you get a fault light during the initial start up or prior to start up it
is most likely a false warning light.  Simply reset the A.T.S. and
start over.

Once you have completed testing of the ATS, be sure you
ALWAYS leave the system in standby mode unless servicing the
unit. For standby operation,  press the "AUTO" button on the front
of the engine control.  The green light should light up under the
"AUTO" button.

SETTING THE EXERCISER CIRCUIT

For all ATS see the instruction manual shipped with the ATS for
instruction on setting the exercise circuit in your ATS

TROUBLESHOOTING TABLES

UNIT WILL NOT CRANK WHEN THE POWER FAILS.

1.

Digital Genset Controller not in "AUTO"

2.

Transfer control switch not in "AUTOMATIC"
position.

3.

Incorrect wiring between transfer switch and
generator.

4.

Defective start stop relay in the transfer
switch.

5.

Circuit breaker tripped on Digital Genset Controller.

6.

Defective Digital Genset Controller

7.

Loose or dirty battery terminals.

Summary of Contents for Winco PSS27LS/D

Page 1: ...PSS40LS Engine Generator Set PACKAGE STANDBY SYSTEMS INSTALLATION AND OPERATIONS MANUAL PSS27LS D PSS40LS C...

Page 2: ...SAVE THESE INSTRUCTIONS This manual contains important instructions that should be followed during installation and maintenance of the generator and batteries Read and understand all instructions in...

Page 3: ...electrician or contractor The installation must comply with all national state and local codes g Always make sure unit is disabled before placing your hands anywhere near the fan belts alternator or...

Page 4: ...4 Industrial four cylinder liquid cooled engine equipped to run on L P N G fuel The engine operates at 1800 rpm and frequency regulation is maintained by the electronic governor within 5 cycles varia...

Page 5: ...temperature battery voltage speed engine load coolant level from ECU ECU specific parameters and run time statistics A Liquid Crystal Display The backlit 64 by 128 pixel LCD serves as the local infor...

Page 6: ...e system clock 1 Press K right key for initial set or K left to back up up down to choose menu item and time date element to be changed 2 Press L Edit to access change mode to enter Password OP as fol...

Page 7: ...uld the instructions or information provided be interpreted to conflict with any local state or national codes If in doubt always consult your local fire marshal or gas supplier WARNING FIRE HAZARD Al...

Page 8: ...d from the secondary regula tor to the generator set WARNING PERSONAL DANGER Do not use galvanized pipe in fuel line runs The galvanized coating can become eroded and flake off causing possible obstru...

Page 9: ...rformed or supervised only by personnel knowledgeable of batteries and the required precautions Keep unauthorized personnel away from batteries When installing or replacing batteries use the proper gr...

Page 10: ...t Check the electrolyte fluid in the battery periodically to be sure it is above the plates Never allow the battery to remain in a discharged condition CONNECTING THE BATTERY CHARGER BLOCKHEATER A two...

Page 11: ...nect your ground wire from the transfer switch to The lugs on the 40 kW will handle wire sizes 6 AWG to 250 MCM and should be torqued to 250 in lbs The lugs on the 27 kW will accommodate 6 AWG to 250...

Page 12: ...tart relay is closed again F CUSTOMER REMOTE STOP LIGHT This set of terminals can be use to light a 12 volt remote light to indicate that the unit is in emergency stop The terminal blocks are designed...

Page 13: ...nd a solid neutral connection The voltage between G1 and G N should be about 120 volts AC 277 on 480 units The same approximate voltage should be found between terminals G3 and G N 120 volts AC On thr...

Page 14: ...OUTPUT FROM GENERATOR 1 Defective diode 2 Defective voltage regulator 3 Defective rotor 4 Defective stator 5 Defective exciter rotor 6 Defective exciter stator 7 AC short in the output leads 8 Defecti...

Page 15: ...s the solenoid opens the pressure should rise to 2 5 to 3 oz just as the engine starts to crank If it is within this range replace the cap on the column If not adjust the screw down to increase and up...

Page 16: ...Page 14 7263 00 60706 188 THREE PHASE AC WIRING HIGH AND LOW WYE THREE PHASE LOW WYE 120 208 VOLTS THREE PHASE HIGH WYE 277 480 VOLTS...

Page 17: ...60706 188 Page 15 7263 00 THREE PHASE AC WIRING DELTA SINGLE PHASE AC WIRING SINGLE PHASE 120 240 VOLTS THREE PHASE DELTA 120 240 VOLTS...

Page 18: ...Page 16 7263 00 60706 188...

Page 19: ...60706 188 Page 17 7263 00 PSS40LS 27LS OUTLINE DRAWING AND WIRING ENTRANCE DIMENSIONS ARE SUBJECT TO CHANGE ALWAYS OBTAIN A CERTIFIED DRAWING FOR CONSTRUCTION PURPOSES...

Page 20: ...e are limited to 12 months or 1000 hours which ever accurs first from date of purchase In no event is WINCO liable for incidental or consequential damages Note Some states do not allow limitation on t...

Reviews: