Installation
Connecting the Air Distribution Module (Canopy)
DryGair Energies Ltd
.
18
The four-direction canopy has a sticker attached to its bottom, indicating
“
This Side Facing Down
” and a notice indicating the canopy should be
positioned according to the colored (red and yellow) stickers on its corners.
The canopy should be connected in an orientation that ensures the alignment
red and yellow sticker on the bottom of the canopy match the red and yellow
stickers on the corners of the unit’s main body.
4.5.2
Side Canopy and One-Direction Canopy
For details on the side canopy and one-direction canopy, see Appendix C.
To connect the Air Distribution Module (Canopy):
Warning
Observe safety regulations when using a stepladder to connect the Air
Distributor Module.
•
Inspect the stepladder to makes sure it is in good condition.
•
Choose a safe spot to anchor the stepladder.
•
Work with a partner. One person should hold the stepladder steady.
1.
Lift the module to the top of the unit.
2.
Ensure the air distribution is directed towards the center of the
greenhouse.
3.
Connect it to the unit frame, using the supplied brackets and screws.
4.
Ensure the module is tightly secured and that its height is just below the
thermal screen (if it exists).
Summary of Contents for DG12
Page 8: ......
Page 59: ...DryGair Dehumidification Unit Appendices Ver 06 2020 51 A 3 DG 12 Standard Split Unit ...
Page 65: ...DryGair Dehumidification Unit Appendices Ver 06 2020 57 A 9 DG 13 Warm Climate Unit ...
Page 67: ...DryGair Dehumidification Unit Appendices Ver 06 2020 59 B 2 DG 6 EU Small Unit ...
Page 69: ...DryGair Dehumidification Unit Appendices Ver 06 2020 61 B 4 DG 6 EU Small Split Unit ...
Page 96: ...Appendices Climate Control System DryGair Energies Ltd 88 ...
Page 97: ...DryGair Dehumidification Unit Appendices Ver 06 2020 89 ...
Page 98: ...Appendices Climate Control System DryGair Energies Ltd 90 ...
Page 101: ...DryGair Dehumidification Unit Comments and Notes Ver 06 2020 93 ...
Page 102: ......