Heat Commander Furnace Installation and Operation Manual
51
9.3.1 Cold start and cold ember bed (The led button light is OFF)
•
Press reload button before
opening the door
•
Place paper and kindling
on top of the ash grate
•
Place two logs
North&South on each side
of the kindling
•
Place another row in a
crisscross pattern on top of
the first logs.
•
Light the paper and leave the door ajar (45 degree). Wait until the kindling and the
logs catch fire. Then close the door.
•
Important: never leave unattended the furnace with the door opened.
Summary of Contents for DF02003
Page 2: ......
Page 24: ...Install the cover on the part B of the assembly and secure it with 16 screws C...
Page 35: ...Heat Commander Furnace Installation and Operation Manual 35 7 1 1 Electrical Diagram...
Page 73: ...Heat Commander Furnace Installation and Operation Manual 73 12 Exploded diagram and parts list...
Page 74: ......
Page 75: ...Heat Commander Furnace Installation and Operation Manual 75...
Page 76: ......
Page 77: ...Heat Commander Furnace Installation and Operation Manual 77...
Page 78: ......
Page 79: ...Heat Commander Furnace Installation and Operation Manual 79...
Page 85: ...Heat Commander Furnace Installation and Operation Manual 85 13 2 1 Technical data...
Page 86: ......
Page 91: ...Heat Commander Furnace Installation and Operation Manual 91...
Page 92: ......