5 Hot air distribution and air return system
The Drolet furnace is designed and equipped with a hot air distribution plenum that may
receive 6 to 10, 6" (152 mm) diameter round ducts.
The installer is responsible of the performance of the distribution ducts and the air
return system. It will have a direct effect on the ability of the blower to distribute heat
efficiently throughout the house. The number, size and length of the ducts of the
distribution system and return air will vary depending on the configuration and
characteristics of each house.
N.B.: The furnace air jacket is not totally airtight. It is normal to detect some air leaks
at the jacket’s joints.
Components provided with the furnace to assemble the hot air distribution plenum:
10 start-off
adapter
(A)
4 block-off cap
(B)
44 Type A
#10 black
screws
(C)
25 #8 selt-
taping black
screws
(D)
4 corners
reinforcem
ent (
E)
1 reload
button
sticker
reminder
(F)
5.1 Hot air distribution plenum height according to ceiling height
Remember to take into account the 5" (127 mm) clearance to combustibles above the plenum.
5.1.1 Plenum’s minimum height (63 ½’’
(1613mm) from the furnace base)
For a minimum ceiling height of 69" (1750
mm).
Summary of Contents for DF02003
Page 2: ......
Page 24: ...Install the cover on the part B of the assembly and secure it with 16 screws C...
Page 35: ...Heat Commander Furnace Installation and Operation Manual 35 7 1 1 Electrical Diagram...
Page 73: ...Heat Commander Furnace Installation and Operation Manual 73 12 Exploded diagram and parts list...
Page 74: ......
Page 75: ...Heat Commander Furnace Installation and Operation Manual 75...
Page 76: ......
Page 77: ...Heat Commander Furnace Installation and Operation Manual 77...
Page 78: ......
Page 79: ...Heat Commander Furnace Installation and Operation Manual 79...
Page 85: ...Heat Commander Furnace Installation and Operation Manual 85 13 2 1 Technical data...
Page 86: ......
Page 91: ...Heat Commander Furnace Installation and Operation Manual 91...
Page 92: ......