11
Installation checklist.
Installation
Before installing your VAPOR-LOGIC
®
3
control system,
review this checklist to ensure proper installation of the
product. Failure to follow the recommendations listed
below could result in failure or damage to the
humidifier or microprocessor.
q
Read this manual and information before starting.
q
See wiring diagram and information located inside
the control cabinet door. Return all information to
the control cabinet after installation.
q
Position the control cabinet so that it is in sight of
the humidifier tank.
q
Position the control cabinet so that the
wire length
from the control cabinet to the humidifier is 15
m or less.
q
Connect an approved electric earth ground to the
earth ground lug in the control cabinet.
q
Never route the low voltage field control wires
near the line voltage section of the control cabinet
or in the same conduit as line voltage wires.
q
Never use shielded cable for water level probe
wiring.
q
Attach the heater/machine ground lug in the
junction box, on the humidifier, to the subpanel
machine ground lug with the appropriate wire,
sized according to local regulations.
q
Use 2-wire, 1 mm
2
shield plenum nonconduit-rated
cable with drain wire for all humidity and
temperature sensor wiring. (Use Belden Company
cable No. 88760 or equivalent; see wiring diagram
for appropriate connections.)
q
Never ground shield at sensor end.
A shield
grounding lug is provided on the control cabinet
subpanel to ground the cable shielding.
q
Keypad installation precautions:
q
Do not locate keypad inside control cabinet.
q
Route modular cable within control cabinet
separated from line voltage circuits.
q
Verify that VAPOR-LOGIC
3
program code,
which is detailed on Pages 8 and 9 of this manual,
matches field requirements.
Installation:
Installation checklist
VL3-IOM-0301-METRIC.pdf 15
11/19/2009 9:22:37 AM
Summary of Contents for Vapor-logic3
Page 4: ......
Page 81: ...77 Operation Notes Operation Notes...
Page 82: ...78 Operation Notes Operation Notes...