9
VAPOR-LOGIC
®
VERSION 6 INSTALLATION AND OPERATION MANUAL
Pre-installation Checklist
Terminal block plug .
Make connections
when the plug is
attached to the
board, or remove for
easier access . Pull
plug straight up to
remove .
Tighten screw after
wire is inserted .
Maximum torque is
3 in-lb (0 .34 N-m)
Remove insulation
from end of wire
and insert wire
here .
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
P15 P16
P17
P18
P19
SSR/BL
Steam
Fill Drain
SDU
NO-2
PV/CA
24
VAC
CAsw 24
VAC
PVsw
TS
24
VDC
DHL
21
VDC
24
VAC
AFsw
NO-1 C-1 C-2
21
VDC
RH
CT/I1 CT/I2 CT/I3 CT/I4
Ethernet
Display
GV1
AI2
Fieldbus
24VAC
Top Mid Low
BT1
LW
FPsw
lsw
TT
GV2
BT2
GV3
BT3
GV4
BT4
AI1
DSTEEM
SW1
Optional LonTalk
®
card location
P20
USB
Vapor-logic board detail
INSTALLATION
FIGURE 9-1: VAPOR-LOGIC TERMINAL BLOCK DETAIL AND CONNECTION INSTRUCTIONS