PLUMBING FIXTURE

 

 

Power water connects to pipes with ¾“ thread in the bottom part of the tank.

 

Blue 

cold 

water supply, red 

– 

hot water outlet.

 

For potential disconnection of the tank, the sanitary 

water inlets and outlets must be provided with screw coupling Js 3/4“.

 

The safety valve is 

mounted on the cold water inlet identified with a blue ring.

 

 

 

Every hot utility water pressure tank shall be equipped with membrane spring loaded with 

safety valve.

 

Nominal clearance of safety valves is defined by standard.

 

Safety valve shall be 

easily accessible, fitted as close as possible to the tank.

 

The inlet pipes must have at least the 

same clearance as the safety valve.

 

Safety valve is placed high enough to secure dripping 

water drain by gravity.

 

We recommend that safety valve is mounted on a branch.

 

This allows 

easier exchange without having to drain the water from the heater.

 

Safety valves with fixed 

pressure settings from the manufacturer are used for the assembly.

 

Starting pressure of a 

safety valve must be identical to the maximum allowed heater pressure, and at least 20 % 

higher than the maximum pressure in the water main (Table 2).

 

If the water main pressure 

exceeds that value, reduction valve must be added to the system.

 No closing armature may 

be mounted between the tank and the safety valve.  

During assembly, follow the guide provided by the safety equipment manufacturer.

 

 

 

It  is  necessary  to  check  the  safety  valve  each  time  before  putting  it  into  operation.

 

It

 

is 

checked  by  manual  moving  of  the  membrane  from  the  seat,  turning  the  make

-

and

-

break 

device button always in the direction of the arrow.

 

After being turned, the button must click 

back into a notch.

 

Proper function of the make

-

and

-

break device results in water draining 

through  the  safety  valve  outlet  pipe.

 

In  common  operation,  such  a  check  needs  to  be 

implemented at least once a month, and after each heater shutdown for more than 5 days.

 

Water may be dripping off the drain pipe of the safety valve; the pipe must be open into the 

air, pointed down; environment temperatures must not drop below zero.

 

When draining the 

tank, use the recommended drain valve.

 

First of all, close water inlet in the tank.

 

 

Find necessary pressure values in the below Table 2.

 

For proper safety valve operation, a backflow valve 

shall be mounted on the inlet pipes, preventing spontaneous heater draining of the tank and hot water 
penetration  back into the water main.

 

We recommend that the hot water distribution from the heater was 

as short as possible to minimise heat losses.

 

At least one demountable joint must be mounted between the 

tank and every supply pipe.

  

Adequate  piping  and  fittings  with  sufficiently  dimensioned  maximum  temperature  and  pressure  values 
must be used.

 

Summary of Contents for Okce 100

Page 1: ...MANUAL STATIONARY ELECTRICAL HOT WATER TANKS OKCE 100 NTR 2 2 kW OKCE 125 NTR 2 2 kW Dru stevn z vody Dra ice stroj rna s r o Dra ice 69 294 71 Ben tky nad Jizerou Phone 420 326 370 990 Fax 420 326 37...

Page 2: ...kW 7 2 3 PLUMBING FIXTURE 8 2 4 PRESSURE LOSSES 9 2 5 CONNECTION OF INDIRECT TANK TO HOT WATER SYSTEM 9 2 6 EXAMPLES OF tankS CONNECTION 10 2 7 FIRST COMMISSIONING 12 2 8 CLEANING OF TANK AND EXCHANG...

Page 3: ...would like to thank you for your decision to use a product of our brand With this guide we will introduce you to the use construction maintenance and other information on electrical water heaters The...

Page 4: ...tube and as a unit it is entirely coated with hot water resistant enamel A flange is welded onto the upper bottom of the receptacle with a flange lid screwed to it A sealing ring is inserted between t...

Page 5: ...524 E 195 195 F 635 765 L 535 635 Typ OKCE 100 NTR 2 2 kW OKCE 125 NTR 2 2 kW 1 3 DESIGN AND BASIC DIMENSIONS OF TANK OKCE 100 NTR 2 2 kW OKCE 125 NTR 2 2 kW Figure 1 1 outer 3 4 inner 3 4 outer 1 2...

Page 6: ...RE OF HOT WATER C 80 Heating surface of bottom heat exchanger m2 1 1 45 BOTTOM HEAT EXCHANGER POWER AT HEATING WATER TEMPERATURE OF 80 AND FLOW OF 720 l h kW 24 32 PERMANENT HOT WATER POWER l h 610 99...

Page 7: ...f the common decalcifying devices was installed with the appliance or that the thermostat was set to the minimum operating temperature of 60o C setting to position ECO For proper operation drinkable w...

Page 8: ...ed between the tank and the safety valve During assembly follow the guide provided by the safety equipment manufacturer It is necessary to check the safety valve each time before putting it into opera...

Page 9: ...heating by electric energy When the tank is connected to power supply the heating element heats water The element is turned on and off by a thermostat After reaching the temperature set the thermosta...

Page 10: ...n the floor next to the heating source or in its proximity The heating circuit shall be connected to marked tank exchanger inputs and outputs and bleeder valve installed at the highest point It is nec...

Page 11: ...ample of group connection of tanks by Tichellman method for equal HSW withdrawal of from all tanks OV Heating water TUV Hot service water SV Cold water 1 Return valve C Circulation 2 Pump Figure 3 Fig...

Page 12: ...heating system turn off electricity an open the valves on the heating water inlet and outlet possibly de aerate the exchanger i once the operation restarts keep flushing the tank until the cloud disap...

Page 13: ...for the thermostat control lights with wires temperature indicator set of M12 or M10 bolts heating element When ordering spare parts give part name type and type number from the heater label 3 OPERAT...

Page 14: ...er is cold Light off Thermostat failure The safety thermostat shut off the power supply Electric supply outside the heater interrupted Temperature of water is not corresponding with the temperature se...

Page 15: ...s of the flange joint of the tank It is not allowed to handle the thermostat aside from temperature resetting with a control button All electric installation handling setting and regulation feature ex...

Page 16: ...livered The service fee was paid pursuant to Act No 477 2001 Coll as amended at EKO KOM a s The client number of the company is F06020274 Take the water boiler packages to a waste disposal place deter...

Reviews: