background image

Drawell International Technology Limited

Web : www.drawell.com.cn

Tel: +86-023-63268643

Email : [email protected]

2

) The distance between the equipment and the wall must be more than 10cm and the

button operation position shall be reserved on the right side.

3) Avoid direct sunlight and keep away from heating equipment;

4) Place the equipment on the horizontal ground, lock the front caster to make the box flat.

5) Turn on the 220V/50Hz power supply and it should be grounded. The equipment

shell should be grounded reliably and placed in a sheltered place from the sun, cool

and ventilated.

IV

. Operation Method

Panel:

Instrument operation

:

1) After the meter is powered on, if the last program has not finished running, it will

continue to run at the breakpoint of the last program. In the normal state, the upper row

will display the measured temperature and the lower row will display the temperature set

value or the remaining time (countdown will start when the set temperature is reached).

Output state will be displayed on both sides (the icon will display when there is output).If

the running program finished, flashing “STOP” will display in the lower row ,indicating that

it is in the STOP state. Press the “

” key for 0.5 seconds to restart the meter. There will

be a beeping reminder at the end of timing, press the “

”key to eliminate the sound.

2) Long press “

” key for 5 seconds in the running state, the lower row alternately

displays the temperature setting value and “AT” prompt, that means entering the heating

PID self-tuning state. During the self-tuning state, the refrigeration and timing are stopped

Summary of Contents for DW-LBI- 80

Page 1: ...International Technology Limited Chongqing Drawell Instrument Co Ltd Shanghai Drawell Scientific Instrument Co Ltd Chongqing Center Suite 2705 Building No 12 Shiyou Road No 1 Yuzhong District Chongqi...

Page 2: ...3 63268643 Email sales05 drawell com cn Contents I Application 3 II Technical Specifications 3 III Installation requirements 3 IV Operation Method 4 V Precautions 6 VI Failure handling methods 7 VII T...

Page 3: ...in a constant temperature environment and the recommended temperature difference is 23 5 Model DW LBI 80 DW LBI 150 DW LBI 200 DW LBI 250 DW LBI 300 DW LBI 400 Chamber Volume 80L 150L 200L 250L 300L...

Page 4: ...finished running it will continue to run at the breakpoint of the last program In the normal state the upper row will display the measured temperature and the lower row will display the temperature s...

Page 5: ...ill display the prompt and the lower row will display the parameter values see the attached table for details of each parameter After setting the parameter long press OK key for 5 seconds to exit the...

Page 6: ...d or alkali and other corrosive articles to wipe the surface The inside chamber can be cleaned regularly with dry cloth When the set temperature is lower than the room temperature the over temperature...

Page 7: ...st setting temperature The temperature controller is broken Change the temperature controller The cable is loose Tighten the cable Timing setting is incorrect Reset or cancel timing Big deviation of t...

Page 8: ...t work normally during warranty period our company is responsible for free repair or replacement of product parts Beyond the warranty we try our best to provide convenience for users IX Packing List W...

Page 9: ...tional Technology Limited Chongqing Drawell Instrument CO Ltd Add Suite 2705 Building No 12 Shiyou Road No 1 Yuzhong District Chongqing China Tel 0086 023 63268643 Shanghai Drawell Scientific Instrume...

Reviews: