![Draper Acumen Recharge E Instructions Installation & Operation Download Page 6](http://html1.mh-extra.com/html/draper/acumen-recharge-e/acumen-recharge-e_instructions-installation-and-operation_2528458006.webp)
Section 5 -
Wake Up Motor
(Exiting Sleep Mode)
e
Each Acumen ReCharge battery motor will come preprogramed from Draper.
Upon leaving the factory the motor is placed into “Sleep Mode” to avoid accidental operation during shipping.
It is necessary to “Wake” the motor before operation and setup.
1.
To “Wake” the motor and exit Sleep Mode assure the screen is mounted on the wall or ceiling.
2.
Plug charging cable into motor and plug cable into a 110V wall outlet
(see Section 6 - page 6)
.
3.
The motor is now no longer in “Sleep Mode” and ready for further setup.
Handheld remote will operate screen out of the box. Limits are set at the factory.
Please Note:
Programming button will face down.
BACK
FRONT
Single Channel
RF Remote
UP
DOWN
STOP
Battery Compartment
(Shown with cover removed)
SETTINGS
Section 6 -
Handheld Remote Control
AT LOWER LIMIT
HALFWAY DOWN
AT UPPER LIMIT
ACUMEN RECHARGE
50%
0%
100%
B
AT
T
ER
Y
C
H
A
R
G
E
R
E
M
A
IN
IN
G
Section 7 -
Check Battery Charge Level
1. Move screen to UPPER LIMIT/
2. Hold the UP button on the remote for 5 Seconds.
3. Screen moves to percentage of battery charge remaining.
SECS
5
APPROX.
SEC S
5
SEC S
5
SEC S
5
HOLD
page 6 of 12
Acumen
™
Recharge E & V