![Draper Acumen Recharge E Instructions Installation & Operation Download Page 3](http://html1.mh-extra.com/html/draper/acumen-recharge-e/acumen-recharge-e_instructions-installation-and-operation_2528458003.webp)
Remove ½”
(13mm)
hex bolts
and
carriage bolts
securing
"green"
brackets to the roller brackets.
2
SCREEN
DOWEL
BACK VIEW
Retighten
Dowel Screws
and repeat on the other
end of the screen dowel.
4
Lower screen surface down some
and remove the
"gold"
brackets
from the dowel.
Retighten the
dowel screws.
3
SCREEN
DOWEL
BACK VIEW
Section 3 -
Removing Shipping Brackets
(Tab-Tensioned Screens Only)
Screen should not be operated until after
dowel shipping brackets are removed
Please Note:
Before fully operating screen: lower viewing surface enough to fully
expose shipping brackets, then remove shipping brackets See Fig. 2.
SCREEN
DOWEL
FRONT VIEW
Roller
Remove ½”
(13mm)
hex bolts
securing
"green"
brackets
to the
"gold"
brackets
attached to dowel.
1
Figure 2
Section 2 -
Fascia Removal
MUST BE DONE PRIOR TO REMOVAL OF SHIPPING BRACKETS
To remove fascia:
1.
Remove the screws from bottom lip at each end
of the fascia using
3/32
” hex wrench.
2.
Lift fascia off of the top lip of the case spine extrusion.
To install fascia:
1.
Hook the top lip of fascia over the top lip of spine extrusion.
2.
Push bottom edge of fascia towards the case spine.
3.
Align holes in fascia with end cap holes and screw in the attachment screw using
3/32
” hex wrench.
1
2
3
Figure 1-B
1
2
Figure 1-A
page 3 of 12
Acumen
™
Recharge E & V