
12
B.
Wiring
1)
Make sure the power supply is at the rated voltage of the appliance.
2)
Ground the heat pump.
3)
Wiring must be installed by a professional installation technician and follow the
circuit diagram.
4)
Set leakage protection device according to the local code for wiring (leakage
action current ≤ 30mA specification).
5)
The layout of power cable and signal cable should be orderly and not interfere
with each other.
C.
Switch on the heat pump after finishing all wiring construction and
re
-
checking.
Summary of Contents for DR-1100HP
Page 1: ......