
A6
TLOIIG
GAS TYPE
ALTITUDE
(FT)
INPUT
(BTUH)
REGULATOR
INPUT
PRESSURE
(Water column
inches)
BURNER
INPUT
PRESSURE
(Water column
inches)
BURNER
ORIFICE SIZE
(DMS)
Propane
0-2000 USA
300,000
11,0
7.5
7/32
Propane
0-4500 CAN
300,000
11,0
7,5
7/32
Natural
0-2000 USA
300,000
7,0
3,5
23/64
Natural
0-4500 CAN
300,000
7,0
3,5
23/64
The burner used is adjusted to be used with the gas indicated on the nameplate. It is
nevertheless possible to convert the burner to another gas by doing the modifications
indicated in the
CONVERSION PROCEDURE
provided with the oven. These
modifications must be done carefully and completely under the company's instruction
to remain conform to A.G.A. or C.G.A standards. Refer to Doyon Equipment to get
the right
CONVERSION KIT.
Air input settings
Adjust the air trap on the burner blower input as stated below:
OVEN
GAS TYPE
AIR ADJUSTEMENT
TLOIG
Propane
6.75
TLOIG
Natural
5.5
TLOIIG
Propane
4
TLOIIG
Natural
3.5
Summary of Contents for TLOIG
Page 20: ...A18 ...
Page 23: ...SECTION B DIMENSIONS ...
Page 24: ...B1 ...
Page 25: ...B2 ...
Page 26: ...B3 ...
Page 27: ...B4 ...
Page 28: ...B5 ...
Page 29: ...B6 ...
Page 30: ...B7 ...
Page 31: ...B8 ...
Page 32: ...B9 ...
Page 33: ...B10 ...
Page 34: ...B11 ...
Page 35: ...B12 ...
Page 36: ...B13 ...
Page 37: ...B14 ...
Page 38: ...SECTION C BURNER AJUSTEMENT ...
Page 39: ...C1 ...
Page 40: ...SECTION E COMPONENT PARTS ...
Page 41: ...E1 ...
Page 43: ...E3 ...
Page 45: ...E5 ...
Page 46: ...E6 ...
Page 47: ...E7 ...
Page 48: ...E8 ...
Page 49: ...E9 ...
Page 51: ...E11 ...
Page 53: ...SECTION F CONTROL PANELS ...
Page 54: ...F1 CONTROL PANEL 120V 208V 3PH 120V 240V 3PH ...
Page 55: ...F2 ...
Page 57: ...F4 CONTROL PANEL 220V 1PH 50hZ ...
Page 58: ...F5 ...
Page 60: ...F7 CONTROL PANEL 120V 208V 3PH WATLOW 120V 240V 3PH WATLOW ...
Page 61: ...F8 ...
Page 63: ...SECTION G ELECTRIC SCHEMATICS ...
Page 64: ...G1 ...
Page 65: ...G2 ...
Page 66: ...G3 ...
Page 67: ...G4 ...
Page 68: ...G5 ...
Page 69: ...G6 ...
Page 70: ...G7 ...