A2
SHIPPING
For your safety, this equipment has been verified by qualified technicians and carefully crated before
shipment. The freight company assumes full responsibility concerning the delivery in good condition
of the equipment in accepting to transport it.
IMPORTANT
RECEPTION OF THE MERCHANDISE
Take care to verify that the received equipment is not damaged before signing the delivery receipt. If
a damage or a lost part is noticed, write it clearly on the receipt. If it is noticed after the carrier has
left, contact immediately the freight company in order for them to their inspection.
We do not assume the responsibility for damages or losses that may occur during transportation.
IN GENERAL
Take off the packaging material with care. Take off all the material used for packing and
accessories.
This equipment can be plugged on any network offering a protection of 15 amps.
INSTALLATION WARNINGS
INSTALLATION AND SERVICE
The dough sheeter must be connected to the utility and electrically grounded in conformity to the
effective local regulations. If these are not established, the dough sheeter must be connected
according to the National Electrical Code (NFPA 70-XX). This equipment has a male plug that
meets those requirements.
Summary of Contents for DL12S
Page 8: ...SECTION B DIMENSIONS...
Page 9: ...B1 G ACAD10 DL12 DL12S dft DL12S...
Page 10: ...B2 G ACAD10 DL12 DL12S dft DL12S 16 7 8 12 1 8 18 1 8 13 15 17 5 8...
Page 11: ...B3 G ACAD10 DL18 DL18S dft DL18S...
Page 12: ...B4 G ACAD10 DL18 DL18S dft DL18S 26 1 4 29 5 8 20 1 2 13 1 2 17 3 8 21 1 4...
Page 13: ...SECTION E COMPONENT PARTS...
Page 14: ...E1 DL12S...
Page 16: ...E3 ROLLER DL12S...
Page 18: ...E5 DL18S...
Page 20: ...E7 SUPERIOR ROLLER DL18S...
Page 22: ...E9 INFERIOR ROLLER DL18S...