![Downee Spring Gate Install Manual Download Page 12](http://html1.mh-extra.com/html/downee/spring-gate/spring-gate_install-manual_2525286012.webp)
CONNECT THE REMOTE
1.
With gate closed showing
(
- - - -
)
Scroll to
P027
& press
OK
2.
Scroll to
d000
& press
OK
3.
Scroll to
P005
& press
OK
4.
When
LEAr
shows press the
remote button.
r000
shows first remote is connected.
Repeat step
3
for extra remotes as needed.
r001
shows when a second remote is connected.
r010
shows when the eleventh remote is connected etc. etc.
6.
Wait 10sec. for the (
- - - -
) symbol to confirm memory
process is complete.
CONNECT THE AERIAL
1.
Thread aerial cable via the hole under the motor.
2.
Strip the outer cable approx. 50mm.
Seperate the inner & outer wires.
Twist the outer wire.
3.
Strip end off the clear inner
insulation. Trim wires so both
are same length.
4.
Attach wires to the Control
Board (shown).
5.
Test Remote Control operates gate. If it
works just fine, replace the Control Board
Cover and Motor Cover cos you’re done!
Something not working the way it should?
Call our Tech Team
SOS
1800 241 733
Aerial
Terminals
Control Board
9