12
5.2.2 Floor Standing Installation
Step 1.
1.
Place battery in the to-be installed area.
2.
Rotate the left latch leftward and the right latc rightward until they are perpendicular to the battery.
≥300mm
≥300mm
3.
away.
Step 2.
Install battery.
1.
Choose an alloy drill bit with a diameter of 12 mm and install it in the drill.
2.
3.
Keep the drilling depth as least 60mm.
4.
Clean the dust and drive expansion tube into hole.
5.
6.
Drive M8 screw through notch of latch into wall.