I
NSTALLATION
6
C
HAPTER
1
1.3.3 I
NSTALLATION
REQUIREMENT
See
1.8 "Installation sheet", on page 1–22
1.3.4 P
UTTING
IN
POSITION
F
IGURE
1.9
D
ELTA
W
AVE
1.3.5 M
ECHANICAL
ADJUSTMENTS
After carefully positioning the machine and allowing for sufficient working space, follow the list
below in setting the machine into its correct attitude.
1.
Place the machine on its intended working location.
When the solderpot is filled, be sure that when leveling the machine, the weight on all leveling-
pads stays roughly the same. To achieve this, do not turn a leveling pad for more than a 360°.
2.
Adjust the leveling pads of the machine until it stands perfectly level in both longitude and
latitude direction. A spirit level should be placed on the underframe for checking the
longitude direction. For the latitude direction the spirit level should be placed on the
solderpot and/or the both conveyorbars.
LEVELING THE MACHINE ONLY WITH THE LEVELING PADS