10
OM-HY/6G(CE)
Initial Start-Up
After the HY-6G(CE) Steamer has been installed, test it to ensure that the unit is
operating correctly.
1. Remove all literature and packing materials from the interior and exterior of the unit.
2.
Make sure the water supply line is open.
3.
Make sure that the gas supply line is open and that the manual knob on the main
gas valve is turned to the “on” position. This valve is located behind the front access
panel on the right side of the unit.
4.
Turn on electrical service to the unit. The HY-6G(CE) will not operate without
electrical power. Do not attempt to operate the unit during a power failure.
5.
The steamer will not operate until the pilot burner has been ignited. To light the pilot
burner, activate the pilot switch located at the lower front, next to the main gas valve.
When the pilot ignition sequence has been successful, a green light on the pilot
switch will glow.
6.
The “trial for ignition” period is roughly 90 seconds. If the pilot burner does not
light within about 90 seconds after the switch is activated, the ignition system
automatically stops gas flow to the pilot burner and stops the ignition trial. If this
happens, turn off the pilot switch and repeat the trial for ignition. During the initial
start-up, the pilot may require several trials for ignition until all the air is bled from
the gas piping. Subsequent start-ups should require only about 5 seconds to achieve
pilot ignition. Reinstall panel(s). NOTE: See Automatic Operation of Pilot at the end of
this section.
7.
Once the pilot burner flame has been established (the green light on the electrical
panel is on), press the ON/OFF touch pad for the desired steamer cavity. The steam
generator will fill with water.
NOTE: The door MUST be closed for the main (high) burner to work.
8.
When the steam generator has filled with water, the main and low burners will ignite
automatically. Within 6-8 minutes the READY light will come on, indicating that the
water has reached its standby temperature. When the READY light is displayed, you
may take any one of the following steps:
a. Set the timer to the desired time for timed steaming.
b. Turn the timer knob to the manual ON position for continuous steam.
c. Let the unit stay at standby temperature.
9.
To shut down the unit, press the ON/OFF touch pad into the off position. The steam
generator will then drain. You may also switch off the pilot switch to conserve energy.
10. If the HY-6G(CE) Steamer behaves as described, the unit is functioning correctly and
ready for use.
WARNING
WHEN YOU OPEN THE DOOR, STAY AWAY
FROM STEAM COMING OUT OF THE UNIT.
THE STEAM CAN CAUSE BURNS.
Summary of Contents for Unified Brands Groen HyperSteam HY-6G
Page 25: ...OM HY 6G CE 25 Electrical Schematic ...
Page 41: ...OM HY 6G CE 41 ...
Page 42: ...42 OM HY 6G CE ...
Page 43: ...OM HY 6G CE 43 ...