ALF-13250-E-01
All-Flo
12
SECTION
7
REPAIR AND ASSEMBLY
PUMP WET END REMOVAL
STEP 1
Using the 9/16 inch wrenches
remove four “Hex-Head Cap
Screws”, eight “Washers” and four
“Hex Nuts” from the “Discharge
Manifold”, “Outer Chamber” and
“Suction Manifold”.
STEP 2
Remove the “Discharge Manifold”.
STEP 3
Remove the “O-Ring”, “Valve Seat”
and “Ball” from the “Discharge
Manifold”.
TOOLS NEEDED
1) One Wrench,
7
/
16
Inch
2) Two Wrenches, ½ Inch
3) Two Wrenches,
9
/
16
Inch
4) One Wrench,
5
/
8
Inch
5) Two Wrenches,
7
/
8
Inch
WARNING
Prior to servicing the pump, ensure that the air
and fluid lines are closed and disconnected. While wearing personal
protective equipment, flush, drain and process liquid from the
pump in a safe manner.
WARNING
Maintenance must not be performed when a hazardous
atmosphere is present.
STEP 4
Set the “Intermediate” with
attached “Outer Chambers” aside.
STEP 5
Remove the “Suction Manifold”.
STEP 6
Remove the “O-Ring”, “Valve
Seat” and “Ball” from the “Outer
Chambers”.
Summary of Contents for PSG C100
Page 1: ...IOM INSTALLATION OPERATION MAINTENANCE C100 PLASTIC 1 INCH AIR OPERATED DOUBLE DIAPHRAGM PUMP ...
Page 6: ...ALF 13250 E 01 All Flo 6 1 PUMP DIMENSIONS CLAMPED PLASTIC SECTION 4 ...
Page 18: ...ALF 13250 E 01 All Flo 18 EXPLODED VIEW PARTS LIST C100 SP CLAMPED PLASTIC SECTION 8 ...