Operation
Operation
9
Putting into operation
•
Open the water tap and plug in the mains
plug.
•
Wait until the correct cooling
compartment temperature is reached.
•
Note the dates on the product packs to be
inserted and observe the expiration date
on already opened packs.
Insert product packs into the cooling
compartment in the following order
:
•
First
insert a product pack into the left-
most position of the cooling compartment
(5,1)
.
If inserting an already opened
pack, make sure to insert this pack
first.
•
Next, place full product packs in the
middle and right positions starting with the
oldest pack,
and
.
•
Close the cooling compartment door.
A corresponding message is
indicated on the display when the
water temperature in the boiler is
not correct. The message is
cleared as soon as the correct
temperature is reached.
If the machine has been out of
operation for a very long time
period (e.g. during works holidays),
put a collecting vessel underneath
the hot water outlet, actuate the hot
water delivery button (
1
) and let at
least 10 l of hot water flow out
before using the machine
.
1
2
3
hot
WATER
1
5
6
Summary of Contents for Cafitesse 4000
Page 1: ...OPERATING INSTRUCTIONS Cafitesse 4000 75525300 11 2004 ...
Page 2: ......