Page 5
Step 5: Assemble the support pipes
For this step, please prepare six upper support pipes(No.7),
six lower support pipes(No.8), twelve M6*78mm carriage
bolts(No.15), twelve brackets(No.16), twelve washers(No.17),
twelve M6 lock nuts(No.18) and two wrenches(No.20)(No.22).
Attention:
The lower support pipe has two holes on one side,
while the upper support pipe doesn’t have.
Insert an below support pipe to each upper support pipe.
Attach six support pipes assembly and twelve brackets to the
frame. And then screw twelve M6*78mm carriage bolts,
twelve washers and twelve M6 lock nuts by using two
wrenches.
Step 6: Assemble the net
There are eight bands on the net. Insert eight bands through eight top caps(No.10) on upper support pipes.
Attach eight plugs to eight bands.
Insert the plugs to the sockets.
Align the connecting holes of the net to the triangular rings of the jumping mat.
Insert a rope(No.11) through the connecting holes and the triangular rings.
15
16
17 18
10
10
11
7
8