Dorner Mfg. Corp.
32
851-899 Rev. A
FlexMove FC (105 mm) Conveyor System
Installation
Fixed Guide Rail Bracket Installation
1. Fasten a fixed guide rail bracket support
to the conveyor beam using T-bolt.
Figure 105
Figure 105
2. Attach the guide rail
to the bracket
. Clamp the spring pin into the slot
between bracket and guide rail to the fixed position.
Figure 106
Figure 106
Guide Rail Connecting Installation
Rail Connecting
1. Slide the guide rail sleeve
into
either one of the guide rail profile that you are going to
join.
Figure 107
Figure 107
2. Move the guide rail sleeve into second profile. Tighten
set screws.
Figure 108
Figure 108
Connecting Plug
1. Connecting plugs
are pressed into
two guide rail ends with soft hammer.
Figure 109
Figure 109
1
1
2
1
1