Dornbracht
Sensory Sky
ATT
Planning
guide
Page 17/38
12V
5A
12V
5A
12V
5A
on site
15 m
on site
1 m
(to be extended to max. 2m
on site)
= Connecting cable
= 12 V line
= equipotential bonding 4 mm²
= Fragrance tube
= ethernet cable
= 230 V AC line (NYM 3 x 1,5 mm²)
= Signal line fragrance module
= Hot water supply
= Cold water supply
= Terminator
electrical installation - schema
5 m
15 m
15 m
15 m
15 m
15 m
7,5 m
0,6 m
0,6 m
2 m
0,6 m
15 m
15 m
The cable length shown here are the delivery status. Cables to be provided on site by the customer are marked as such.
The length of the ductwork for cables has to be shorter (see page 16).
T
T
Concealed rough parts rain panel +
Hand shower set
Water installation
Water installation - schema
electrical installation
electrical installation
- schema
Installation pre-wall
Concealed rough parts for
electronic control elements
Cutouts / anchoring points
Trim installation
Positioning
recommendations
Components
Zones of protection
Pre-wall installation