Plumbing / dry wall planning advice
use this checklist to verify that you have all the information you need from your SeNSORY SKY consultations.
The following items are particularly important:
Maximum difference in flow pressure between hot and cold water 1.0 bar
Water supply (HW + CW) 2x DN 20 – G1/2" to be connected via concealed rough for eVALVe (hand shower set).
The pipe diameter (DN 20) has to be adhered to for both pipes and fittings
A min. distance for a circulation pipe (DN 15) of 900 mm from the eVALVe (hand shower set) is required if a hot water
circulation system is installed
Leaktest after rough installation according to
eN 806-4 / DIN 1988-2
Pipe flushing after rough installation according to
eN 806-4 / DIN 1988-2
Calculate optimum floor drain sizing, connected rating 1.5 l/s., drainage pipe DN 75
(calculated according to e.g. DIN 1986)
Plumbing / dry wall Planning adVice
electrical and fragrance planning advice
Plumbing / dry wall rough-in
electrical and fragrance rough-in
Trim installation / Start-up
Positioning
recommendations
Components
Zones of protection
Pre-wall installation