electrical and fragrance rough-in
use this checklist to verify that you have all the information you need from your SeNSORY SKY
ATT
consultations.
The following items are particularly important:
Adhered to max. distances and max. vertical height
Installed three power supply units, fragrance control module, DC Filter and AC filter in sub distribution board
Installed Ethernet cable (coming from SENSORY SKY
ATT
) in sub-distribution board
2x power supply cables coming from ceiling installation enclosure for rain panel installed in sub-distribution board
Installed equipotential bonding 2 x 4 mm² for ceiling installation enclosure for rain panel and concealed rough part
eVALVE (hand shower set)
Installed connecting cables between
ceiling installation enclosure for rain panel, hand shower set, control elements
and fragrance control module in sub-distribution board
Fastened Connecting cables in the pre-wall (via cable ties)
Installed all cables without damage to the cables
Checked electrical protection for SeNSORY SKY
ATT
:
- earth leakage circuit breaker (30 mA, 2-pin, type A)
- Safety cutout (6 A, type B),
- 3 x circuit breaker (16A, Type 1S)
- equipotential bonding busbar in subdistribution board
- equipotential bonding (4 mm²) for concealed rough part eVALVe (hand shower set)
electrical installation in accordance with VDe 0100. Please conform to national statutory regulations, where different
Plumbing / dry wall planning advice
electrical and fragrance planning advice
Plumbing / dry wall rough-in
electrical and fragrance rough-in
Positioning
recommendations
Components
Zones of protection
Pre-wall installation