dormakaba TS93 GSR PT Installation Instructions
08281850
08-2019
TS93 GSR Surface Applied Closers
8
Coordinating system
2.6 Installing the coordinator system
Fig.8
2.6.1
Close both door leafs.
2.6.2
Push plastic guide element up against slide
shoe.
2.6.3
Fully wind trigger dial (towards door frame).
2.6.4
Align connecting channel with trigger dial per
image above.
2.6.5
Mark and cut connecting channel.
2.6.6
Open active leaf to retract clamping rod.
2.6.7
Active door: Insert connecting channel into
trigger dial.
2.6.8
Inactive door: Insert connecting channel into
plastic guide.
2.6.9
Unwind trigger dial (away door frame) until
active door starts to close.
Clamping plate
should be perpendicular to clamping rod.
2.6.10 Tighten set screw to secure trigger dial.
NOTE: The locking pin can be discarded once system has
been installed.
CUT LENGTH
Cut mark
reference
Plastic guide
element
Slide shoe
Trigger dial
Connecting
channel
Clamping rod
Trigger
dial
Connecting
channel
Set
screw
Locking
pin
Plastic
guide
Clamping plate