
Disassembly and assembly of major components
- 91 -
<Piston ring gap>
Piston ring groove clearance.
●
Assemble the piston ring at the piston.
●
Measure the each ring
′
s groove clear-
ance and if the measured value
exceeds the limit value, replace rings
or piston.
<Piston side clearance>
(4) Piston pin
Outside diameter
With the outside micrometer, measure the
piston pin
′
s outside diameter and if the
value is same as the use limit value or less,
replace it.
Piston pin & connecting rod bush clear-
ance
Inspect the clearance between the piston
pin and the connecting rod bush, if it is
more than the use limit value, replace either
one that is more severe.
Division
Standard
Limit
Top ring
0.30 ~ 0.50 mm
1.5 mm
2nd ring
1.10 ~ 1.30 mm
1.5 mm
Oil ring
0.25 ~ 0.55 mm
1.5 mm
EA0M4032
Feeler gauge
Division
Specified value
Limit
value
Top ring 0.105 ~ 0.150 mm 1.5 mm
2nd ring 0.050 ~ 0.082 mm 0.15 mm
Oil ring 0.030 ~ 0.062 mm 0.15 mm
EA0M4031
Standard
Limit
ø45.994 ~ ø46.0 mm
ø45.979 mm
EA3M2047
Limit
0.055 ~ 0.071 mm
Summary of Contents for AD158TI
Page 2: ......
Page 16: ...Specification 10...
Page 25: ...Commissioning and operation 19 2 Digital gauge panel Circuit diagram EDV2218035...
Page 34: ...Commissioning and operation 28...
Page 56: ...General information 50...
Page 70: ...Main accessory parts 64...
Page 120: ...Disassembly and assembly of major components 114...
Page 172: ...Main parts maintenance 166...
Page 187: ...Governor Actuator Controller...
Page 188: ......
Page 221: ...33 6 Product dimension 170 130 140 153 165 6 19 4 6 EDL11160004...
Page 253: ...HY DP MANUAL 001 Digital Panel for Marine Engines Service Manual Ver 1 0 Doosan Infracore...
Page 294: ......