Donaldson iCue Sensor Integrated Gateway Installation, Operation And Maintenance Manual Download Page 6

3

Donaldson Company, Inc.

Electrical installation must be performed by a qualified electrician and comply with all applicable national and local 

codes.

Compressed air installation must be performed by a qualified pipe fitter.

Penetrations into the dust collector must be air and dust tight.

Location Considerations

The gateway should be installed in a convenient location that does not interfere with any safety systems or the normal operation 

and maintenance of the collector. The preferred location is as high as feasible to increase the cellular signal strength.

Overview

The hardware kit received includes the gateway and other accessories required for installation; reference Replacement Parts List 

for what is included in the kit. There may be situations where additional materials are needed to complete the installation. A typical 

installation will involve the following steps:
1.  Shut down the dust collector and isolate the compressed air supply source.
2.  Install the Donaldson gateway.
3.  Connect pneumatic tubing to the gateway.
4.  Connect optional sensors to the gateway.
5.  Attach the antenna to the gateway.

The gateway is always on, monitoring the sensors associated with the solution. If a sensor value exceeds the user-defined alert 

thresholds, the gateway will communicate that data to the Donaldson iCue application for alerting purposes. Otherwise, during 

normal operation the gateway communicates to the Donaldson iCue application at predefined intervals.
LEDs on the gateway indicate the status of the gateway. Reference the Troubleshooting section for definition of the LED states.

 3 Operation

 4 Installation

Summary of Contents for iCue Sensor Integrated Gateway

Page 1: ...warnings in this manual DO NOT install operate or perform maintenance on this product until you have read and understood the instructions precautions and warnings contained within this manual Donaldso...

Page 2: ...on com Disclaimers Information in this document is subject to change without notice and does not represent a commitment on the part of the Donaldson Company Inc Donaldson provides this documents as is...

Page 3: ...Location Considerations 3 Overview 3 Mounting 4 Gateway Electrical Installation 4 Low Pressure P Pneumatic Installation 5 High Pressure Compressed Air Pneumatic Installation 5 Gateway Final Assembly...

Page 4: ...ct is used Since these factors are uniquely within the user s knowledge and control it is essential the user evaluate the Donaldson products to determine whether the product is fit for the particular...

Page 5: ...card are provided by Donaldson The SIM card will only work with Donaldson s service and should not be removed Note This manual only covers the installation operation and troubleshooting of the Donald...

Page 6: ...at is included in the kit There may be situations where additional materials are needed to complete the installation A typical installation will involve the following steps 1 Shut down the dust collec...

Page 7: ...rom the magnets and mount the device Note Allow 20 minutes for the adhesive to cure prior to mounting the gateway from a metallic surface Flange The gateway and power supply may be mounted using the m...

Page 8: ...supplied 3 16 in ID translucent blue tubing connect the clean air pressure sense line to the Clean port of the gateway Notice To prevent inaccurate sensor readings it is recommended the tubing is ins...

Page 9: ...EDs Red Orange Green Verify the Power and iCue Service Connectivity LEDs turn green This may take several minutes Gateway Final Assembly 5 Replacement Parts List Part Number Description R060015 Kit Se...

Page 10: ...g Input 2 Input Signal 10VDC 20mA max 9 Analog Input 2 Ground 10 Analog Input 3 24VDC Output Max output 25 mA 11 Analog Input 3 Input Signal 10VDC 20mA max 12 Analog Input 3 Ground 13 Analog Input 4 2...

Page 11: ...iCue application Orange Initializing connection to Donaldson iCue application Red Connection failure Off Not connected to Donaldson iCue application 3 Cellular Strength Green Good connection quality...

Page 12: ...t Green If Cellular Strength LED is OFF or Red reference troubleshooting for that condition Note it may take up to 5 minutes for the iCue Service Connectivity LED to turn green after the Cellular LED...

Page 13: ...egrated Gateway The gateway can accommodate up to four 4 analog sensors and two 2 digital inputs Analog Sensors The Donaldson iCue Sensor Integrated Gateway can accommodate analog sensors with a 0 10V...

Page 14: ...Sensor 4 Wire Sensor The Donaldson iCue Sensor Integrated Gateway can support 2 3 or 4 wire sensors using the following wiring configurations These diagrams are representative of installing an analog...

Page 15: ...set according to the following position Digital High Switch Digital Low Switch Sensed Stated By Gateway Wiring Diagram Unactuated Switch State Actuated Switch State Jumper Setting Normally Open Conta...

Page 16: ...on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and recei...

Page 17: ...st accept any interference including interference that may cause undesired operation of the device Informations concernant l exposition aux frux friti radio RF La puissance de sortie mise par l appare...

Page 18: ...A3 Donaldson Company Inc Service Notes Date Service Performed Notes...

Page 19: ...ontact Information Donaldson Company Inc 1400 W 94th Street Bloomington MN 55431 1 833 898 5996 FCC Compliance Statement e g products subject to Part 15 This device complies with Part 15 of the FCC Ru...

Page 20: ...application including the conditions under which the product is used Since these factors are uniquely within the user s knowledge and control it is essential the user evaluate the products to determi...

Reviews: