- 3 -
Process enclosure, extract offtake, hose/ducting and extract/filtration unit.
Inspection and Maintenance Record
3. Monthly Inspection
In addition to weekly checks. Disconnect hoses and check for blockage and smooth operation of fan, signs
of dust or vapour / gas / odour carry over. Tick boxes to confirm system ok / change. Add details of any
changes. Report changes to Engineering Manager. Record any remedial actions taken.
Month
number
Date
System
ok
System
Change
Details of change / repairs etc
Initial
1
2
3
4
5
6
7
8
9
10
11
12
4. Yearly Inspection
Annual service
To include all regular checks together with inspection
of filter condition and replacement where necessary,
motor and electrical checks,
Comments
Signature of Supervisor :
Date:
Annual Thorough Inspection and Testing of LEV
System in accordance with C.O.S.H.H. Regulation 9
(max interval 14 months) including reporting.
Comments
Signature of Supervisor :
Date: