background image

29-31 Richland St. Kingsgrove. Sydney NSW 2208 Australia

Phone: 02 9554 9600     |     Fax: 02 9554 9433

[email protected]     |     www.domuslighting.com

Installation Manual

Yellow/Green(Lamp Wire) 

Blue(PIR Wire)

Black(PIR Wire)

Brown(PIR Wire)

Brown(Power Cable)

Yellow/Green(Power  Cable)

Blue(Power Cable)

Blue(Lamp Wire)

Brown (Lamp Wire)

Wall Mounting Cover

Screws (M3--2pcs)

Screws (M3--2pcs)

Gasket 

 Rubber Stopper

Lamp Body

Plastic plugs

Power Cable

Cable Anchorage

Fixing Cover Screws(x2)

Terminal Block

Mounting Wall Screws (2pcs)

Installation

1. 

Installation by a licensed electrician and according to IEC wiring Regulation.

2.  Switch power off at the meter box and ensure that there is no power to the lamp.

3. 

Unscrew the Fixing Cover Screws then remove the cover.

4. 

Remove the Cable Anchorage and Terminal Block.

5.  Use the plastic back box to mark the position of screw holes onto mounting surface. Drill the wall to    

depth of about 4 cm and fit the wall plugs (supplied). Care should be taken to avoid drilling or screwing   

into concealed electrical wiring.

6. 

Connecting the Power Cable to the Terminal Block, ensure the cable must penetrate through    

 

the Cable Gasket.

7. 

Affix the back box to the mounting surface with Mounting Wall Screws (supplied).

8.  Re-fit the Terminal Block and Cable Anchorage.

9. 

Re-fit the cover.

Reviews: