1. GENERAL INFORMATION
A.
THREE SPECIFIC NEEDS:
1. Installation opening
Cut through roof and ceiling
3. Power must be above l05V- and frequency
must be 60 Hz at all times.
2. Additional Wiring
115V-60 Hz - 20 Amp
,
S P E C I A L
SHORE LINE
COMPARTMENT
FUSE PANEL
WIRING VOLT LOSSES
ALTITUDE