Base installation•Installation de la base
35
Fig. 10
Note The wall panels should be installed at a temperature near 16°C(60°F)
and must not be installed in unheated areas where temperatures might
drop below 0°C(32°F).
The wall panels can be installed over drywall, plaster, painted walls,
plywood or ceramic tile, Wall surfaces must be solid, dry, clean and
smooth. Scrape off any loose paint, wallpaper or plaster. It is strongly
recommended that raw plaster or new wallboard be primed or water
sealed prior to installation.
If the panels are being installed over existing tile, and over 30% of the
removed during wall preparation, it is recommended that the remaining
tiles also be removed. Existing ceramic tile should be lightly sanded.
The vertical alignment from the edge of the shower base each side
(Fig.10), and draw plumb lines on
Remarque: Les panneaux muraux doivent être installés à une température
proche de 16 ° C (60 ° F) et ne doivent pas être installés dans des endroits
non chauffés où les températures peuvent descendre en dessous de 0 ° C
(32 ° F).
Les panneaux muraux peuvent être installés sur les cloisons sèches, le
plâtre, les murs peints, de contreplaqué ou de carreaux de céramique,
surfaces muraux doivent être solides, secs, propres. Gratter la peinture
écaillée, papier peint ou autre. Il est fortement recommandé que le plâtre
brut ou nouveau mur soit amorcé ou l’eau fermé avant l'installation.
Si les panneaux sont installés sur des carreaux existent, il est recommandé
que les tuiles restantes soient enlevées. Les carreaux de céramique
existentes doivent être légèrement sablées.
L'alignement vertical du bord de la base de douche de chaque côté (Fig.10),
et tracer des lignes avec un crayon de plomb
: