BG80 USE AND MAINTENANCE BOOKLET
Rev.1 of 23/04/2013 of BG80 uk agg2013 Page 14 of 40
4
4
COMMISSIONING
4
4
.
.
1
1
.
.
CHECKS TO BE PERFORMED UPON INITIAL START-UP
Ensure that the motor rotates in a clockwise direction (as shown by the arrow located on the motor), run the
motor for a number of seconds, ensure that the motor's cooling fan, and therefore the propeller, rotate in a
clockwise direction.
If the propeller is not clearly visible when close to the mixer, check the rotation direction on the mixing blade of
the drive motor.
There is a risk of damage to the mixer, to objects and to people if the machine is used in the
opposite rotation direction to that specified.
Check that the mixer is correctly secured to the chosen installation surface.
Check that all screws that come into contact with the mixer are correctly tightened.
Both the moving parts of the orientation device and the support bearings for the fixing screws must be
sufficiently lubricated.
Check that the oil levels in the transmission, the gearbox and the hand pump for hydraulic adjustment, and then
start the machine up.
The correct quantity of oil is as follows:
⇒
18 litres of
SHELL OMALA S4 WE 320
(or equivalent) for the reducer;
⇒
42 litres of SAE80 oil – W90 for the transmission;
⇒
3 litres of Nuto 68 oil (or equivalent) for the hand pump.
To check the oil, proceed as follows:
-
Unscrew the inlet cap and the breather cap if present;
-
If the oil has been refilled, wait at least 3 hours before turning on the machine;
-
Close the caps.
-
Check the levels periodically, the oil must never fall below the specified level.
N.B.: N.B. During filling and inspection, the transmission pipe should be in the vertical position.