background image

DME HOIST RING 

INSTALLATION INFORMATION 

Select the proper Hoist Ring for the job. Do not attempt to apply 
more then the rated load capacity. 

The load capacity is marked 

on the hoist ring. 

Drill and tap the workpiece so that the hoist ring bolt is installed 
perpendicular to the surface of the workpiece. Countersink the 
tapped hole to prevent “swelling” of the top thread when the 
hoist ring bolt is torqued. The workpiece surface must be flat, 
providing complete contact for the hoist ring bushing. 

Do not use spacers between the hoist ring bushing and the 
workpiece surface. 

When installing in soft metal, such as aluminum, the minimum 
effective thread engagement should be two times the diameter 
of the bolt. When installing in steel, thread engagement should 
be 1-1/2 times the bolt diameter. 

Always 

tighten the bolt to the proper torque value

, which is 

stamped on the hoist ring. 

Loosening of the bolt may develop during use. 

Re-tightening to the required torque must be done whenever 

the bolt loosens

. The proper tightening torque is stamped on the hoist ring. 

When lifting, apply force gradually. 

DO NOT APPLY SHOCK LOADS

For through-hole applications, be sure that nut/washer are the same quality grade as the hoist ring 

Periodic visual inspection and pull testing is recommended as damage can occur from improper 
usage.

 

DME Company 

 29111 Stephenson Highway 

 Madison Heights 

 MI 

48071 

800-626-6653

Reviews: