Safety guide
After receiving this product, first, confirm the product package is intact. If any
question, contact the logistic company or local distributor immediately.
The installation and operation of the system must be carried out by
professional technicians. They have received professional training, and
thoroughly familiar with all the contents in this manual and the safety
requirements of the electrical system.
Do not carry out connection/disconnection, unpacking inspection and unit
replacement operations on the system when the power source is applied.
Before wiring and inspection, users must confirm the breakers on DC and
AC side of the inverter are disconnected and wait for at least 5 mins
Ensure there is no substantial electromagnetic interference caused by other
electronic or electrical devices around the installation site.
Do not refit the system unless authorized.
All the electrical installation must conform to local and national electrical
standards.
Ground with proper technics before the operation
Do not open the surface cover of the system unless authorized. The
electronic components inside the system are electrostatic sensitive. Do take
proper anti-electrostatic measures during authorized operation.
Do not touch the housing of the system or the radiator to avoid scald as
they may become hot during operation
The system needs to be reliably grounded.
Ensure that DC and AC side circuit breakers have been disconnected and
wait at least 5 minutes before wiring and checking.
Note: Technical personnel who can perform installation, wiring, commissioning,
maintenance, troubleshooting and replacement of the energy storage inverters must
meet the following requirements:
•
Operators need professional training and should wear the recommended PPE.
•
Operators must read this manual thoroughly and understand the related
safety precautions.
•
Operators need to be familiar with the relevant safety regulations for
electrical systems in the region of the installation.
•
Operators need to be fully aware of the composition, operating principle of the
entire energy storage system, and related standards in the region of the installation
.
Summary of Contents for Soluna S8 EU-A50
Page 19: ...Page 19 of 60 Appearance Figure 2 3 Appearance Number Name Remark Soluna brand LCD panel ...
Page 20: ...Page 20 of 60 ...
Page 22: ...Page 22 of 60 Installation Installation tools ...
Page 50: ...Page 50 of 60 2 Register Click Register to create new account you can use email to register ...
Page 53: ...Page 53 of 60 3 4 Now you can see your plant on the homepage ...