
WP-2 Bubble Fog Machine
9 / 16
4.
First time setup
ATTENTION!
Before using the device for the first time, remove all packaging materials.
1.
After checking that the device is intact and complete, please place it
on a flat surface.
2.
Fill the tanks with fluid! Please only use the recommended fluids,
otherwise the device may be damaged and the guarantee will be
void.
3.
Make sure that there is always enough fluid in the tanks.
4.
Connect the device to the mains.
5.
The device starts to heat up. This process takes about 3 minutes, during
which time "Warming up" is shown on the display.
6.
The heating process is complete. "Ready TO Work" appears on the
display.
4.1.
Control
It is operated via the display, the remote control or via DMX.
MENU
Calling up the menu structure to make
individual settings.
UP / TIMER
Select a menu item or increase a value.
Activate the timer.
DOWN / VOLUME
Select a menu item or decrease a value. Start
manual ejection.
ENTER / STOP
Confirm the selection or the setting made. Stop
manual ejection.