Operating instructions
cod. 1592011000
1592011000 XC706M GB 31-08-2001
rel. 1.0
Pa. 12 / 23
dLF “doF” delay enabled also for the first switching off. It enables the “doF” delay
between the request of a release and the actual switching off.
(no = “doF” not enabled; yES=”doF” enabled)
odo: Regulation delay on start-up: (0÷255s) on switching ON the instrument starts working
after the time delay imposed in this parameter.
5.2.3
Operating and reduced set point
LSE: Minimum set point: The measurement unit depends on dEU parameter. Sets the
minimum value that can be used for the set point, to prevent the end user from setting
incorrect values
HSE: Maximum set point: The measurement unit depends on dEU parameter.. Sets the
maximum acceptable value for set point.
StrS: Start time reduced set. (0÷23 h) Starting time for reduced set point operation time
interval.
SPrS:
Stop time reduced set (0÷23 h) Stopping time for the reduced set point operation
time interval.
RSd1 Reduced set point enabling for Sunday (no= reduced set disabled; yES= reduced set
enabled)
....
RSd7 Reduced set point enabling for Saturday (no= reduced set disabled; yES= reduced
set enabled)
NOTE: RSd1=Sunday, RSd2=Monday ... Rsd7=Saturday.
5.2.4
Alarms
Uaro: Measurement unit for the Aro parameter
(min = minutes; Hour = hours)
Aro: Alarm override it is the period following the silencing of an alarm during which the alarm
signalling is disabled. After this time if the alarm condition lasts the relay and the buzzer
are enabled again. (0÷255m/h 0=always on; 255=always disabled)
PAo: Alarm probe exclusion at power on. it is the period starting from instrument switch on,
before an alarm probe is signalled. (0÷255 min). During this time if the pressure is out of
range all the compressor are switched on.
LAL: Low pressure alarm: The measurement unit depends on dEU parameter. When the
value SET-LAL is reached the A03C alarm is enabled, (possibly after the tAo delay time).
HAL: High pressure alarm: The measurement unit depends on dEU parameter. When the
value SET+HAL is reached the A04C alarm is enabled, (possibly after the tAo delay
time).
tAo: Low and High pressure (temperature) alarms delay: (0÷255 min) time interval
between the detection of a pressure (temperature) alarm condition and alarm signalling.
Ser: Service request: (1÷9999 hours) number of running hours after that the “A14C”
maintenance call is generated.
PEn: Low pressure-switch intervention numbers: (0÷15 with 0 the manually unlocking is
disabled) if the low pressure-switch is enabled PEn times in the PEI interval, the
controller is locked. Only the manually unlocking is possible. See also the alarms table at
paragraph 10. Every time the pressure-switch is enabled all the compressor are turned
off.
PEI: Pressure-switch interventions time (0÷15 min) Interval, linked to the Pen parameter, for
counting interventions of the low pressure-switch..
CPP: compressor management with faulty probe (A01C)
0 = maintaining the resource entered at the moment of the failure