TECHNICAL MANUAL
LARGE DISPLAYS DN109/NB - DN119/NB - DN189/NB - DN129/NB
CHAPTER 22
INITIALIZATION
22-1
22
INITIALIZATION
Start-up
Before connecting to power supply please be sure all the above mentioned advices are
done.
During the boot process, the different initialization stages will be indicated on the display,
in order:
(11) Pr0:
Each time the display is powered up and before starting the main program, an
access time is stablished to enable bootloader. This allows to upgrade display in case of
FW corruption. This can be done through the emergency IP address
192.168.1.100
.
While thi
s time is on, “PR0” is displayed. Refer to
(12) Test sequence of the led segments:
While this time all display segments are activated
one by one, and lately they are deactivated in reverse order, so everyone can check if
they all are working properly.
(13) F.XX:
Displays the hardware ID
. “XX” corresponds to the specific value corresponding to
the actual display. If the unit has the color option, the digits will light up changing color.
(14) uX.X:
Shows the firmware release.
“XX” corresponds to the specific value corresponding
to the actual display. If the unit has the color option, the digits will light up changing color.
(15) Display is ready:
It shows the value send from the PC / PLC, or hyphens if no information
is sent (
time without data activated), or zero ”0” if no device is connected.
Note: To show all the displays connected to network and allow quick to them please
download the “Display discoverer” program (
https://www.ditel.es/descargas
To configure the display, it must be connected by ethernet cable (RJ45) to the same
network as the PC in use. It is also possible to do it by WIFI.