8
lift to adjust for leveling. Each post has this adjustment. Adjust the proper columns to level the
lift. Place level on each runway and crossbeam and check for proper levelness.
./4%9/5-!9(!6%4/,//3%.4(%.545.$%24/00,!4%4/-!+%!$*534-%.43
!FTERLEVELINGISCOMPLETETIGHTENTHE.UTONTHE,OCK2ODUNDERNEATHTHE4OP#APONEACHPOST4HIS
will lock the Lock Ladder in position.
2AISELIFTOFFALLLOCKSUNTILCABLESARESUPPORTINGTHELIFT!DJUSTTHE#ABLE.YLON,OCK.UT)TEM LO
CATEDONTHETOPOFEACHPOSTUNTILLIFTISLEVELONCROSSBEAMSANDRUNWAYS4HISWILLENSURETHELIFTTRAVELS
up and down level.
./4%9/5-!9.%%$4/53%,/#+).'0,)%234/(/,$4(%#!",%&2/-452.).'7(%.!$*534).'4(%
.9,/..54-!+%352%4(!44(2%!$3%.'!'%4(2/5'(.9,/./.%!#(.9,/..54
2EINSTALL#ROSSBEAM#OVERS)TEMS &IGUREANDTHEBOTTOM2UNWAY#OVER)TEM
&IGUREONTOTHEUNDERSIDEOFTHE-AINSIDE2UNWAY
)NSTALLFRONT7HEEL3TOPS)TEM AND&OOT0LATE)TEM WITHPROVIDEDHARDWAREASSHOWNIN&IGURE
)NSTALLTHE$RIVE/N2AMPS)TEM WITH#ONNECTING&RAME)TEM ASSHOWNIF&IGURE
./4%
"%352%4/,5"2)#!4%!,,#!",%3(%!6%3"%!2).'3!.$3(!&437)4(!'2%!3%'5.02)/24//0%2
-
!4).'4(%,)&4
14
8
9
10
13
15
13
12
11